DTE Energy 2014.03.31 10Q


 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
___________________________________
FORM 10-Q

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934

For the Quarterly Period ended March 31, 2014
Commission file number 1-11607
DTE ENERGY COMPANY
(Exact name of registrant as specified in its charter)
Michigan
38-3217752
(State or other jurisdiction of
(I.R.S. Employer
incorporation or organization)
Identification No.)
 
 
One Energy Plaza, Detroit, Michigan
48226-1279
(Address of principal executive offices)
(Zip Code)
313-235-4000
(Registrant’s telephone number, including area code)
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Yes x No o
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes x No o
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
Large accelerated filer x
 
Accelerated filer o
 
Non-accelerated filer o
 
Smaller reporting company o
 
 
 
 
(Do not check if a smaller reporting company)
 
 
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).
Yes o No x
At March 31, 2014, 177,016,824 shares of DTE Energy’s common stock were outstanding, substantially all of which were held by non-affiliates.
 





DTE Energy Company

Quarterly Report on Form 10-Q
Quarter Ended March 31, 2014

TABLE OF CONTENTS

 
Page
 
 
EX-10-88
 
EX-12-57
EX-31-89
EX-31-90
EX-32-89
EX-32-90
EX-101.INS XBRL Instance Document
EX-101.SCH XBRL Taxonomy Extension Schema
EX-101.CAL XBRL Taxonomy Extension Calculation Linkbase
EX-101.DEF XBRL Taxonomy Extension Definition Database
EX-101.LAB XBRL Taxonomy Extension Label Linkbase
EX-101.PRE XBRL Taxonomy Extension Presentation Linkbase




DEFINITIONS
 
CFTC
U.S. Commodity Futures Trading Commission
 
 
 
 
Citizens
Citizens Fuel Gas Company, which distributes natural gas in Adrian, Michigan
 
 
 
 
Company
DTE Energy Company and any subsidiary companies
 
 
 
 
Customer Choice
Michigan legislation giving customers the option to choose alternative suppliers for electricity and natural gas.
 
 
 
 
DTE Electric
DTE Electric Company (a direct wholly owned subsidiary of DTE Energy Company) and subsidiary companies.
 
 
 
 
DTE Energy
DTE Energy Company, directly or indirectly the parent of DTE Electric, DTE Gas and numerous non-utility subsidiaries.
 
 
 
 
DTE Gas
DTE Gas Company (an indirect wholly owned subsidiary of DTE Energy) and subsidiary companies.
 
 
 
 
EPA
United States Environmental Protection Agency
 
 
 
 
FASB
Financial Accounting Standards Board
 
 
 
 
FERC
Federal Energy Regulatory Commission
 
 
 
 
FOV
Finding of Violation
 
 
 
 
FTRs
Financial transmission rights are financial instruments that entitle the holder to receive payments related to costs incurred for congestion on the transmission grid.
 
 
 
 
GCR
A Gas Cost Recovery mechanism authorized by the MPSC that allows DTE Gas to recover through rates its natural gas costs.
 
 
 
 
MDEQ
Michigan Department of Environmental Quality
 
 
 
 
MISO
Midcontinent Independent System Operator, Inc.
 
 
 
 
MPSC
Michigan Public Service Commission
 
 
 
 
MTM
Mark-to-market
 
 
 
 
Non-utility
An entity that is not a public utility. Its conditions of service, prices of goods and services and other operating related matters are not directly regulated by the MPSC.
 
 
 
 
NOV
Notice of Violation
 
 
 
 
NRC
United States Nuclear Regulatory Commission
 
 
 
 
Production tax credits
Tax credits as authorized under Sections 45K and 45 of the Internal Revenue Code that are designed to stimulate investment in and development of alternate fuel sources. The amount of a production tax credit can vary each year as determined by the Internal Revenue Service.
 
 
 
 
PSCR
A Power Supply Cost Recovery mechanism authorized by the MPSC that allows DTE Electric to recover through rates its fuel, fuel-related and purchased power costs.
 
 
 
 
RDM
A Revenue Decoupling Mechanism authorized by the MPSC that is designed to minimize the impact on revenues of changes in average customer usage.
 
 
 
 
Securitization
DTE Electric financed specific stranded costs at lower interest rates through the sale of rate reduction bonds by a wholly-owned special purpose entity, The Detroit Edison Securitization Funding LLC.
 
 
 
 
Subsidiaries
The direct and indirect subsidiaries of DTE Energy Company
 
 
 
 
VIE
Variable Interest Entity

1



 
 
 
 
Units of Measurement
 
 
 
 
 
Bcf
Billion cubic feet of natural gas
 
 
 
 
BTU
Heat value (energy content) of fuel
 
 
 
 
kWh
Kilowatthour of electricity
 
 
 
 
MMBtu
One million BTU
 
 
 
 
MWh
Megawatthour of electricity


2



FORWARD-LOOKING STATEMENTS
Certain information presented herein includes “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 with respect to the financial condition, results of operations and business of DTE Energy. Words such as “anticipate,” “believe,” “expect,” “projected,” “aspiration” and “goals” signify forward-looking statements. Forward-looking statements are not guarantees of future results and conditions, but rather are subject to numerous assumptions, risks and uncertainties that may cause actual future results to be materially different from those contemplated, projected, estimated or budgeted. Many factors may impact forward-looking statements including, but not limited to, the following:

impact of regulation by the FERC, MPSC, NRC, CFTC and other applicable governmental proceedings and regulations, including any associated impact on rate structures;
the amount and timing of cost recovery allowed as a result of regulatory proceedings, related appeals or new legislation; including legislative amendments and Customer Choice programs;
economic conditions and population changes in our geographic area resulting in changes in demand, customer conservation and thefts of electricity and natural gas;
environmental issues, laws, regulations, and the increasing costs of remediation and compliance, including actual and potential new federal and state requirements;
health, safety, financial, environmental and regulatory risks associated with ownership and operation of nuclear facilities;
changes in the cost and availability of coal and other raw materials, purchased power and natural gas;
the potential for losses on investments, including nuclear decommissioning and benefit plan assets and the related increases in future expense and contributions;
volatility in the short-term natural gas storage markets impacting third-party storage revenues;
volatility in commodity markets, deviations in weather and related risks impacting the results of our energy trading operations;
access to capital markets and the results of other financing efforts which can be affected by credit agency ratings;
instability in capital markets which could impact availability of short and long-term financing;
the timing and extent of changes in interest rates;
the level of borrowings;
the potential for increased costs or delays in completion of significant construction projects;
changes in and application of federal, state and local tax laws and their interpretations, including the Internal Revenue Code, regulations, rulings, court proceedings and audits;
the effects of weather and other natural phenomena on operations and sales to customers, and purchases from suppliers;
unplanned outages;
the cost of protecting assets against, or damage due to, terrorism or cyber attacks;
employee relations and the impact of collective bargaining agreements;
the availability, cost, coverage and terms of insurance and stability of insurance providers;
cost reduction efforts and the maximization of plant and distribution system performance;
the effects of competition;
changes in and application of accounting standards and financial reporting regulations;
changes in federal or state laws and their interpretation with respect to regulation, energy policy and other business issues;
binding arbitration, litigation and related appeals; and
the risks discussed in our public filings with the Securities and Exchange Commission.

New factors emerge from time to time. We cannot predict what factors may arise or how such factors may cause our results to differ materially from those contained in any forward-looking statement. Any forward-looking statements speak only as of the date on which such statements are made. We undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made or to reflect the occurrence of unanticipated events.


3




Part I — Financial Information

Item 1. Financial Statements

DTE Energy Company

Consolidated Statements of Operations (Unaudited)

 
Three Months Ended March 31,
 
2014
 
2013
 
(In millions, except per share amounts)
Operating Revenues
$
3,930

 
$
2,516

Operating Expenses
 
 
 
Fuel, purchased power and gas
2,155

 
1,024

Operation and maintenance
841

 
735

Depreciation, depletion and amortization
280

 
259

Taxes other than income
95

 
94

Asset (gains) and losses, reserves and impairments, net
(1
)
 
(6
)
 
3,370

 
2,106

Operating Income
560

 
410

Other (Income) and Deductions
 
 
 
Interest expense
110

 
109

Interest income
(2
)
 
(2
)
Other income
(41
)
 
(44
)
Other expenses
8

 
7

 
75

 
70

Income Before Income Taxes
485

 
340

Income Tax Expense
158

 
105

Net Income
327

 
235

Less: Net Income Attributable to Noncontrolling Interest
1

 
1

Net Income Attributable to DTE Energy Company
$
326

 
$
234

 
 
 
 
Basic Earnings per Common Share
 
 
 
Net Income Attributable to DTE Energy Company
$
1.84

 
$
1.35

 
 
 
 

 
 
 
Diluted Earnings per Common Share
 
 
 
Net Income Attributable to DTE Energy Company
$
1.84

 
$
1.34

 
 
 
 
 
 
 
 
Weighted Average Common Shares Outstanding
 
 
 
Basic
177

 
173

Diluted
177

 
173

Dividends Declared per Common Share
$
0.66

 
$
0.62


See Notes to Consolidated Financial Statements (Unaudited)


4




DTE Energy Company

Consolidated Statements of Comprehensive Income (Unaudited)

 
Three Months Ended March 31,
 
2014
 
2013
 
(In millions)
Net income
$
327

 
$
235

 
 
 
 
Other comprehensive income (loss), net of tax:
 
 
 
Benefit obligations, net of taxes of $— and $1

 
3

Foreign currency translation, net of taxes of $(1) and $—
(1
)
 
(1
)
Other comprehensive income (loss)
(1
)
 
2

 
 
 
 
Comprehensive income
326

 
237

Less comprehensive income attributable to noncontrolling interests
1

 
1

Comprehensive income attributable to DTE Energy Company
$
325

 
$
236


See Notes to Consolidated Financial Statements (Unaudited)



5




DTE Energy Company

Consolidated Statements of Financial Position (Unaudited)

 
March 31,
 
December 31,
 
2014
 
2013
 
(In millions)
ASSETS
Current Assets
 
 
 
Cash and cash equivalents
$
98

 
$
52

Restricted cash, principally Securitization
57

 
123

Accounts receivable (less allowance for doubtful accounts of $56 and $55, respectively)
 
 
 
Customer
1,811

 
1,542

Other
140

 
127

Inventories
 
 
 
Fuel and gas
208

 
363

Materials and supplies
272

 
265

Derivative assets
79

 
99

Regulatory assets
130

 
26

Other
178

 
209

 
2,973

 
2,806

Investments
 
 
 
Nuclear decommissioning trust funds
1,195

 
1,191

Other
596

 
603

 
1,791

 
1,794

Property
 
 
 
Property, plant and equipment
25,384

 
25,123

Less accumulated depreciation, depletion and amortization
(9,399
)
 
(9,323
)
 
15,985

 
15,800

Other Assets
 
 
 
Goodwill
2,018

 
2,018

Regulatory assets
2,792

 
2,837

Securitized regulatory assets
182

 
231

Intangible assets
118

 
122

Notes receivable
92

 
102

Derivative assets
17

 
27

Other
193

 
198

 
5,412

 
5,535

Total Assets
$
26,161

 
$
25,935


See Notes to Consolidated Financial Statements (Unaudited)

6




DTE Energy Company

Consolidated Statements of Financial Position (Unaudited) — (Continued)
 
March 31,
 
December 31,
 
2014
 
2013
 
(In millions, except shares)
LIABILITIES AND EQUITY
Current Liabilities
 
 
 
Accounts payable
$
945

 
$
962

Accrued interest
118

 
90

Dividends payable
116

 
116

Short-term borrowings
375

 
131

Current portion long-term debt, including capital leases
1,069

 
898

Derivative liabilities
140

 
195

Gas inventory equalization
142

 

Regulatory liabilities
175

 
302

Other
489

 
495

 
3,569

 
3,189

Long-Term Debt (net of current portion)
 
 
 
Mortgage bonds, notes and other
6,438

 
6,618

Securitization bonds

 
105

Junior subordinated debentures
480

 
480

Capital lease obligations
5

 
11

 
6,923

 
7,214

Other Liabilities
 

 
 

Deferred income taxes
3,390

 
3,321

Regulatory liabilities
829

 
862

Asset retirement obligations
1,854

 
1,827

Unamortized investment tax credit
44

 
47

Derivative liabilities
16

 
43

Accrued pension liability
630

 
653

Accrued postretirement liability
328

 
350

Nuclear decommissioning
175

 
178

Other
266

 
297

 
7,532

 
7,578

Commitments and Contingencies (Notes 6 and 10)
 
 
 
 
 
 
 
Equity
 
 
 
Common stock, without par value, 400,000,000 shares authorized, 177,016,824 and 177,087,230 shares issued and outstanding, respectively
3,894

 
3,907

Retained earnings
4,360

 
4,150

Accumulated other comprehensive loss
(137
)
 
(136
)
Total DTE Energy Company Equity
8,117

 
7,921

Noncontrolling interests
20

 
33

Total Equity
8,137

 
7,954

Total Liabilities and Equity
$
26,161

 
$
25,935


See Notes to Consolidated Financial Statements (Unaudited)

7




DTE Energy Company

Consolidated Statements of Cash Flows (Unaudited)
 
Three Months Ended March 31,
 
2014
 
2013
 
(In millions)
Operating Activities
 
 
 
Net income
$
327

 
$
235

Adjustments to reconcile net income to net cash from operating activities:
 
 
 
Depreciation, depletion and amortization
280

 
259

Nuclear fuel amortization
5

 
9

Allowance for equity funds used during construction
(5
)
 
(3
)
Deferred income taxes
77

 
65

Asset (gains) and losses, reserves and impairments, net
(1
)
 
(6
)
Changes in assets and liabilities:
 
 
 
Accounts receivable, net
(270
)
 
(78
)
Inventories
147

 
221

Accounts payable
100

 
(126
)
Gas inventory equalization
142

 
140

Accrued pension obligation
(23
)
 
(46
)
Accrued postretirement obligation
(22
)
 
(154
)
Derivative assets and liabilities
(51
)
 
18

Regulatory assets and liabilities
(222
)
 
152

Other assets
50

 
34

Other liabilities
(2
)
 
(123
)
Net cash from operating activities
532

 
597

Investing Activities
 
 
 
Plant and equipment expenditures — utility
(399
)
 
(309
)
Plant and equipment expenditures — non-utility
(98
)
 
(73
)
Proceeds from sale of assets
3

 
4

Restricted cash for debt redemption, principally Securitization
66

 
57

Proceeds from sale of nuclear decommissioning trust fund assets
271

 
136

Investment in nuclear decommissioning trust funds
(275
)
 
(140
)
Other
(10
)
 
(7
)
Net cash used for investing activities
(442
)
 
(332
)
Financing Activities
 
 
 
Issuance of long-term debt, net of issuance costs

 
372

Redemption of long-term debt
(115
)
 
(141
)
Short-term borrowings, net
244

 
(240
)
Issuance of common stock

 
10

Repurchase of common stock
(50
)
 

Dividends on common stock
(116
)
 
(107
)
Other
(7
)
 
(6
)
Net cash used for financing activities
(44
)
 
(112
)
Net Increase in Cash and Cash Equivalents
46

 
153

Cash and Cash Equivalents at Beginning of Period
52

 
65

Cash and Cash Equivalents at End of Period
$
98

 
$
218

 
 
 
 
Supplemental disclosure of non-cash investing and financing activities
 
 
 
Plant and equipment expenditures in accounts payable
$
212

 
$
219


See Notes to Consolidated Financial Statements (Unaudited)

8




DTE Energy Company

Consolidated Statements of Changes in Equity (Unaudited)

 
 
 
 
 
 
 
Accumulated
Other Comprehensive Loss
 
Non-Controlling Interests
 
 
 
Common Stock
 
Retained Earnings
 
 
 
 
 
Shares
 
Amount
 
 
 
 
Total
 
(Dollars in millions, shares in thousands)
Balance, December 31, 2013
177,087

 
$
3,907

 
$
4,150

 
$
(136
)
 
$
33

 
$
7,954

Net income

 

 
326

 

 
1

 
327

Dividends declared on common stock

 

 
(116
)
 

 

 
(116
)
Repurchase of common stock
(690
)
 
(50
)
 

 

 

 
(50
)
Foreign currency translation, net of tax

 

 

 
(1
)
 

 
(1
)
Stock-based compensation, distributions to noncontrolling interests and other
620

 
37

 

 

 
(14
)
 
23

Balance, March 31, 2014
177,017

 
$
3,894

 
$
4,360

 
$
(137
)
 
$
20

 
$
8,137


See Notes to Consolidated Financial Statements (Unaudited)



9




DTE Energy Company

Notes to Consolidated Financial Statements (Unaudited)

NOTE 1 — ORGANIZATION AND BASIS OF PRESENTATION

Corporate Structure

DTE Energy owns the following businesses:

DTE Electric, an electric utility engaged in the generation, purchase, distribution and sale of electricity to approximately 2.1 million customers in southeastern Michigan;

DTE Gas, a natural gas utility engaged in the purchase, storage, transportation, distribution and sale of natural gas to approximately 1.2 million customers throughout Michigan and the sale of storage and transportation capacity; and

Other businesses involved in 1) natural gas pipelines, gathering and storage; 2) power and industrial projects; and 3) energy marketing and trading operations.

DTE Electric and DTE Gas are regulated by the MPSC. Certain activities of DTE Electric and DTE Gas, as well as various other aspects of businesses under DTE Energy are regulated by the FERC. In addition, the Company is regulated by other federal and state regulatory agencies including the NRC, the EPA, the MDEQ and the CFTC.

References in this Report to “Company” or “DTE” are to DTE Energy and its subsidiaries, collectively.

Basis of Presentation

These Consolidated Financial Statements should be read in conjunction with the Notes to Consolidated Financial Statements included in the 2013 Annual Report on Form 10-K.

The accompanying Consolidated Financial Statements are prepared using accounting principles generally accepted in the United States of America. These accounting principles require management to use estimates and assumptions that impact reported amounts of assets, liabilities, revenues and expenses, and the disclosure of contingent assets and liabilities. Actual results may differ from the Company’s estimates.

The Consolidated Financial Statements are unaudited, but in the Company's opinion include all adjustments necessary to present a fair statement of the results for the interim periods. All adjustments are of a normal recurring nature, except as otherwise disclosed in these Consolidated Financial Statements and Notes to Consolidated Financial Statements. Financial results for this interim period are not necessarily indicative of results that may be expected for any other interim period or for the fiscal year ending December 31, 2014.

Certain prior year balances were reclassified to match the current year’s financial statement presentation. Such revisions included an increase in the Consolidated Statements of Cash Flows line items for (i) Proceeds from sale of nuclear decommissioning trust funds, and (ii) Investment in nuclear decommissioning trust funds by $124 million for the three months ended March 31, 2013. These revisions were needed to properly state the gross purchases and sales activity in the nuclear decommissioning trust fund for the quarter. The total of Net cash used in investing activities for the three months ended March 31, 2013 was unchanged by these revisions. The revisions noted above are not deemed material, individually or in the aggregate, to the prior period consolidated financial statements.

Principles of Consolidation

The Company consolidates all majority-owned subsidiaries and investments in entities in which it has controlling influence. Non-majority owned investments are accounted for using the equity method when the Company is able to influence the operating policies of the investee. When the Company does not influence the operating policies of an investee, the cost method is used. These consolidated financial statements also reflect the Company's proportionate interests in certain jointly owned utility plants. The Company eliminates all intercompany balances and transactions.


10


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The Company evaluates whether an entity is a VIE whenever reconsideration events occur. The Company consolidates VIEs for which it is the primary beneficiary. If the Company is not the primary beneficiary and an ownership interest is held, the VIE is accounted for under the equity method of accounting. When assessing the determination of the primary beneficiary, the Company considers all relevant facts and circumstances, including: the power, through voting or similar rights, to direct the activities of the VIE that most significantly impact the VIE's economic performance and the obligation to absorb the expected losses and/or the right to receive the expected returns of the VIE. The Company performs ongoing reassessments of all VIEs to determine if the primary beneficiary status has changed.

Legal entities within the Company's Power and Industrial Projects segment enter into long-term contractual arrangements with customers to supply energy-related products or services. The entities are generally designed to pass-through the commodity risk associated with these contracts to the customers, with the Company retaining operational and customer default risk. These entities generally are VIEs and consolidated when the Company is the primary beneficiary. In addition, we have interests in certain VIEs through which we share control of all significant activities for those entities with our partners, and therefore are accounted for under the equity method.

The Company has variable interests in VIEs through certain of its long-term purchase contracts. As of March 31, 2014, the carrying amount of assets and liabilities in the Consolidated Statements of Financial Position that relate to its variable interests under long-term purchase contracts are predominately related to working capital accounts and generally represent the amounts owed by the Company for the deliveries associated with the current billing cycle under the contracts. The Company has not provided any form of financial support associated with these long-term contracts. There is no significant potential exposure to loss as a result of its variable interests through these long-term purchase contracts.

In 2001, DTE Electric financed a regulatory asset related to Fermi 2 and certain other regulatory assets through the sale of rate reduction bonds by a wholly-owned special purpose entity, Securitization. DTE Electric performs servicing activities including billing and collecting surcharge revenue for Securitization. This entity is a VIE and is consolidated by the Company.

The maximum risk exposure for consolidated VIEs is reflected on the Company's Consolidated Statements of Financial Position. For non-consolidated VIEs, the maximum risk exposure is generally limited to its investment and amounts which it has guaranteed.


11


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The following table summarizes the major balance sheet items for consolidated VIEs as of March 31, 2014 and December 31, 2013. All assets and liabilities of a consolidated VIE are presented where it has been determined that a consolidated VIE has either (1) assets that can be used only to settle obligations of the VIE or (2) liabilities for which creditors do not have recourse to the general credit of the primary beneficiary. VIEs, in which the Company holds a majority voting interest and is the primary beneficiary, that meet the definition of a business and whose assets can be used for purposes other than the settlement of the VIE's obligations have been excluded from the table below.
 
March 31, 2014
December 31, 2013
 
Securitization
 
Other
 
Total
 
Securitization
 
Other
 
Total
 
(In millions)
ASSETS
 
 
 
 
 
 
 
 
 
 
 
Cash and cash equivalents
$

 
$
15

 
$
15

 
$

 
$
12

 
$
12

Restricted cash
36

 
6

 
42

 
100

 
8

 
108

Accounts receivable
40

 
11

 
51

 
34

 
16

 
50

Inventories

 
19

 
19

 

 
118

 
118

Other current assets

 
1

 
1

 

 
1

 
1

Property, plant and equipment, net

 
92

 
92

 

 
99

 
99

Securitized regulatory assets
182

 

 
182

 
231

 

 
231

Other assets
3

 
8

 
11

 
4

 
8

 
12

 
$
261

 
$
152

 
$
413

 
$
369

 
$
262

 
$
631

 
 
 
 
 
 
 
 
 
 
 
 
LIABILITIES
 
 
 
 
 
 
 
 
 
 
 
Accounts payable and accrued current liabilities
$
1

 
$
12

 
$
13

 
$
7

 
$
23

 
$
30

Current portion long-term debt, including capital leases
202

 
9

 
211

 
196

 
9

 
205

Current regulatory liabilities
41

 

 
41

 
43

 

 
43

Other current liabilities

 
4

 
4

 

 
4

 
4

Mortgage bonds, notes and other

 
19

 
19

 

 
21

 
21

Securitization bonds

 

 

 
105

 

 
105

Capital lease obligations

 
4

 
4

 

 
7

 
7

Other long-term liabilities
8

 
2

 
10

 
8

 
2

 
10

 
$
252

 
$
50

 
$
302

 
$
359

 
$
66

 
$
425


Amounts for non-consolidated VIEs as of March 31, 2014 and December 31, 2013 are as follows:
 
March 31, 2014
 
December 31, 2013
 
(In millions)
Other investments
$
134

 
$
141

Notes receivable
$
8

 
$
8



NOTE 2 — SIGNIFICANT ACCOUNTING POLICIES

Other Income

Other income is recognized for non-operating income such as equity earnings, interest and dividends, allowance for funds used during construction and contract services. Power & Industrial Projects also recognizes Other income in connection with the sale of membership interests in reduced emissions fuel facilities to investors. In exchange for the cash received, the investors will receive a portion of the economic attributes of the facilities, including income tax attributes. The transactions are not treated as a sale of membership interests for financial reporting purposes. Other income is considered earned when refined coal is produced and tax credits are generated. Power & Industrial Projects recognized approximately $17 million and $15 million of Other income for the three months ended March 31, 2014 and 2013, respectively.

12


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Comprehensive Income (Loss)

Comprehensive income (loss) is the change in common shareholders’ equity during a period from transactions and events from non-owner sources, including net income. As shown in the following tables, amounts recorded to accumulated other comprehensive loss for the three months ended March 31, 2014 include unrealized gains and losses from derivatives accounted for as cash flow hedges, unrealized gains and losses on available-for-sale securities, the Company’s interest in other comprehensive income of equity investees, which comprise the net unrealized gains and losses on investments, changes in benefit obligations, consisting of deferred actuarial losses, prior service costs and transition amounts related to pension and other postretirement benefit plans, and foreign currency translation adjustments.

 
Changes in Accumulated Other Comprehensive Loss by Component (a)
 
For The Three Months Ended March 31, 2014
 
Net Unrealized Gain/(Loss) on Derivatives
 
Net Unrealized Gain/(Loss) on Investments
 
Benefit Obligations (b)
 
Foreign Currency Translation
 
Total
 
(In millions)
Beginning balance, December 31, 2013
$
(4
)
 
$
(6
)
 
$
(126
)
 
$

 
$
(136
)
Other comprehensive income before reclassifications

 

 
(2
)
 
(1
)
 
(3
)
Amounts reclassified from accumulated other comprehensive income

 

 
2

 

 
2

Net current-period other comprehensive income

 

 

 
(1
)
 
(1
)
Ending balance, March 31, 2014
$
(4
)
 
$
(6
)
 
$
(126
)
 
$
(1
)
 
$
(137
)
______________________________________
(a)
All amounts are net of tax.
(b)
The amounts reclassified from accumulated other comprehensive income are included in the computation of the net periodic pension and other postretirement benefits cost (see Note 11).

Intangible Assets

The Company has certain intangible assets relating to emission allowances, renewable energy credits and non-utility contracts as shown below:
 
March 31,
 
December 31,
 
2014
 
2013
 
(In millions)
Emission allowances
$
2

 
$
2

Renewable energy credits
50

 
51

Contract intangible assets
127

 
126

 
179

 
179

Less accumulated amortization
48

 
45

Intangible assets, net
131

 
134

Less current intangible assets
13

 
12

 
$
118

 
$
122


Emission allowances and renewable energy credits are charged to expense, using average cost, as the allowances and credits are consumed in the operation of the business. The Company amortizes contract intangible assets on a straight-line basis over the expected period of benefit, ranging from 1 to 28 years.

Income Taxes

The Company's effective tax rate for the three months ended March 31, 2014 was 33% as compared to 31% for the three months ended March 31, 2013. The 2% increase in effective tax rate is due to $8 million of deferred tax expense resulting from New York state income tax reform enacted on March 31, 2014.


13


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The Company had $2 million of unrecognized tax benefits at March 31, 2014, that, if recognized, would favorably impact its effective tax rate. The Company believes that it is possible that there will be a decrease in the unrecognized tax benefits of up to $1 million in the next twelve months.


NOTE 3 — FAIR VALUE

Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date in a principal or most advantageous market. Fair value is a market-based measurement that is determined based on inputs, which refer broadly to assumptions that market participants use in pricing assets or liabilities. These inputs can be readily observable, market corroborated or generally unobservable inputs. The Company makes certain assumptions it believes that market participants would use in pricing assets or liabilities, including assumptions about risk, and the risks inherent in the inputs to valuation techniques. Credit risk of the Company and its counterparties is incorporated in the valuation of assets and liabilities through the use of credit reserves, the impact of which was immaterial at March 31, 2014 and December 31, 2013. The Company believes it uses valuation techniques that maximize the use of observable market-based inputs and minimize the use of unobservable inputs.

A fair value hierarchy has been established that prioritizes the inputs to valuation techniques used to measure fair value in three broad levels. The fair value hierarchy gives the highest priority to quoted prices (unadjusted) in active markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. All assets and liabilities are required to be classified in their entirety based on the lowest level of input that is significant to the fair value measurement in its entirety. Assessing the significance of a particular input may require judgment considering factors specific to the asset or liability, and may affect the valuation of the asset or liability and its placement within the fair value hierarchy. The Company classifies fair value balances based on the fair value hierarchy defined as follows:

Level 1 — Consists of unadjusted quoted prices in active markets for identical assets or liabilities that the Company has the ability to access as of the reporting date.

Level 2 — Consists of inputs other than quoted prices included within Level 1 that are directly observable for the asset or liability or indirectly observable through corroboration with observable market data.

Level 3 — Consists of unobservable inputs for assets or liabilities whose fair value is estimated based on internally developed models or methodologies using inputs that are generally less readily observable and supported by little, if any, market activity at the measurement date. Unobservable inputs are developed based on the best available information and subject to cost-benefit constraints.


14


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The following table presents assets and liabilities measured and recorded at fair value on a recurring basis as of March 31, 2014 and December 31, 2013:
 
March 31, 2014
 
December 31, 2013
 
Level 1
 
Level 2
 
Level 3
 
Netting (a)
 
Net Balance
 
Level 1
 
Level 2
 
Level 3
 
Netting (a)
 
Net Balance
 
(In millions)
Assets:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cash equivalents (b)
$
11

 
$
47

 
$

 
$

 
$
58

 
$
10

 
$
115

 
$

 
$

 
$
125

Nuclear decommissioning trusts
764

 
431

 

 

 
1,195

 
779

 
412

 

 

 
1,191

Other investments (c) (d)
89

 
49

 

 

 
138

 
92

 
44

 

 

 
136

Derivative assets:
 

 
 

 
 

 
 

 
 
 
 

 
 

 
 

 
 

 
 
Commodity Contracts:
 

 
 

 
 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
Natural Gas
251

 
72

 
60

 
(367
)
 
16

 
273

 
89

 
34

 
(382
)
 
14

Electricity

 
426

 
77

 
(422
)
 
81

 

 
261

 
139

 
(291
)
 
109

Other
36

 
3

 
1

 
(41
)
 
(1
)
 
33

 
1

 
3

 
(34
)
 
3

Total derivative assets
287

 
501

 
138

 
(830
)
 
96

 
306

 
351

 
176

 
(707
)
 
126

Total
$
1,151

 
$
1,028

 
$
138

 
$
(830
)
 
$
1,487

 
$
1,187

 
$
922

 
$
176

 
$
(707
)
 
$
1,578

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Liabilities:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Derivative liabilities:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Contracts:
 

 
 

 
 

 
 

 
 
 
 

 
 

 
 

 
 

 
 
Natural Gas
$
(255
)
 
$
(91
)
 
$
(70
)
 
$
369

 
$
(47
)
 
$
(277
)
 
$
(140
)
 
$
(86
)
 
$
395

 
$
(108
)
Electricity

 
(413
)
 
(111
)
 
417

 
(107
)
 

 
(272
)
 
(126
)
 
269

 
(129
)
Other
(34
)
 
(6
)
 

 
41

 
1

 
(32
)
 
(2
)
 

 
34

 

Other derivative contracts (f)

 
(4
)
 

 
1

 
(3
)
 

 
(1
)
 

 

 
(1
)
Total derivative liabilities
(289
)
 
(514
)
 
(181
)
 
828

 
(156
)
 
(309
)
 
(415
)
 
(212
)
 
698

 
(238
)
Total
$
(289
)
 
$
(514
)
 
$
(181
)
 
$
828

 
$
(156
)
 
$
(309
)
 
$
(415
)
 
$
(212
)
 
$
698

 
$
(238
)
Net Assets (Liabilities) at the end of the period
$
862

 
$
514

 
$
(43
)
 
$
(2
)
 
$
1,331

 
$
878

 
$
507

 
$
(36
)
 
$
(9
)
 
$
1,340

Assets:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Current
$
270

 
$
514

 
$
115

 
$
(762
)
 
$
137

 
$
277

 
$
400

 
$
139

 
$
(592
)
 
$
224

Noncurrent (e)
881

 
514

 
23

 
(68
)
 
1,350

 
910

 
522

 
37

 
(115
)
 
1,354

Total Assets
$
1,151

 
$
1,028

 
$
138

 
$
(830
)
 
$
1,487

 
$
1,187

 
$
922

 
$
176

 
$
(707
)
 
$
1,578

Liabilities:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Current
$
(259
)
 
$
(472
)
 
$
(168
)
 
$
759

 
$
(140
)
 
$
(268
)
 
$
(328
)
 
$
(177
)
 
$
578

 
$
(195
)
Noncurrent
(30
)
 
(42
)
 
(13
)
 
69

 
(16
)
 
(41
)
 
(87
)
 
(35
)
 
120

 
(43
)
Total Liabilities
$
(289
)
 
$
(514
)
 
$
(181
)
 
$
828

 
$
(156
)
 
$
(309
)
 
$
(415
)
 
$
(212
)
 
$
698

 
$
(238
)
Net Assets (Liabilities) at the end of the period
$
862

 
$
514

 
$
(43
)
 
$
(2
)
 
$
1,331

 
$
878

 
$
507

 
$
(36
)
 
$
(9
)
 
$
1,340

_______________________________________
(a)
Amounts represent the impact of master netting agreements that allow the Company to net gain and loss positions and cash collateral held or placed with the same counterparties.
(b)
At March 31, 2014, available-for-sale securities of $58 million included $43 million and $15 million of cash equivalents included in Restricted cash and Other investments on the Consolidated Statements of Financial Position, respectively. At December 31, 2013, available-for-sale securities of $125 million, included $109 million and $16 million of cash equivalents included in Restricted cash and Other investments on the Consolidated Statements of Financial Position, respectively.
(c)
Excludes cash surrender value of life insurance investments.
(d)
Available-for-sale equity securities of $7 million at both March 31, 2014 and December 31, 2013, are included in Other investments on the Consolidated Statements of Financial Position.
(e)
Includes $138 million and $136 million at March 31, 2014 and December 31, 2013, respectively, of other investments that are included in the Consolidated Statements of Financial Position in Other investments.
(f)
Includes Interest rate contracts and Foreign currency exchange contracts.

Cash Equivalents

Cash equivalents include investments with maturities of three months or less when purchased. The cash equivalents shown in the fair value table are comprised of short-term investments and money market funds.

15


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Nuclear Decommissioning Trusts and Other Investments

The nuclear decommissioning trusts and other investments hold debt and equity securities directly and indirectly through institutional mutual funds. Exchange-traded debt and equity securities held directly are valued using quoted market prices in actively traded markets. The institutional mutual funds hold exchange-traded equity or debt securities and are valued based on stated net asset values (NAV). Non-exchange-traded fixed income securities are valued based upon quotations available from brokers or pricing services. A primary price source is identified by asset type, class or issue for each security. The trustee monitors prices supplied by pricing services and may use a supplemental price source or change the primary price source of a given security if the trustee determines that another price source is considered to be preferable. DTE Energy has obtained an understanding of how these prices are derived, including the nature and observability of the inputs used in deriving such prices. Additionally, DTE Energy selectively corroborates the fair value of securities by comparison of market-based price sources. Investment policies and procedures are determined by the Company's Trust Investments Department which reports to the Company's Vice President and Treasurer.

Derivative Assets and Liabilities

Derivative assets and liabilities are comprised of physical and financial derivative contracts, including futures, forwards, options and swaps that are both exchange-traded and over-the-counter traded contracts. Various inputs are used to value derivatives depending on the type of contract and availability of market data. Exchange-traded derivative contracts are valued using quoted prices in active markets. DTE Energy considers the following criteria in determining whether a market is considered active: frequency in which pricing information is updated, variability in pricing between sources or over time and the availability of public information. Other derivative contracts are valued based upon a variety of inputs including commodity market prices, broker quotes, interest rates, credit ratings, default rates, market-based seasonality and basis differential factors. DTE Energy monitors the prices that are supplied by brokers and pricing services and may use a supplemental price source or change the primary price source of an index if prices become unavailable or another price source is determined to be more representative of fair value. DTE Energy has obtained an understanding of how these prices are derived. Additionally, DTE Energy selectively corroborates the fair value of its transactions by comparison of market-based price sources. Mathematical valuation models are used for derivatives for which external market data is not readily observable, such as contracts which extend beyond the actively traded reporting period. The Company has established a Risk Management Committee whose responsibilities include directly or indirectly ensuring all valuation methods are applied in accordance with predefined policies. The development and maintenance of our forward price curves has been assigned to our Risk Management Department, which is separate and distinct from the trading functions within the Company.

The following tables present the fair value reconciliation of Level 3 assets and liabilities measured at fair value on a recurring basis for the three months ended March 31, 2014 and 2013:

 
Three Months Ended March 31, 2014
 
Three Months Ended March 31, 2013
 
Natural Gas
 
Electricity
 
Other
 
Total
 
Natural Gas
 
Electricity
 
Other
 
Total
 
(In millions)
Net Assets (Liabilities) as of January 1
$
(52
)
 
$
13

 
$
3

 
$
(36
)
 
$
(38
)
 
$
23

 
$
2

 
$
(13
)
Transfers into Level 3

 

 

 

 

 

 

 

Transfers out of Level 3

 

 

 

 
(2
)
 

 

 
(2
)
Total gains (losses):
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Included in earnings
(22
)
 
36

 

 
14

 
(8
)
 
8

 

 

Recorded in regulatory assets/liabilities

 

 
4

 
4

 

 

 
1

 
1

Purchases, issuances and settlements:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Issuances

 
(1
)
 

 
(1
)
 

 

 

 

Settlements
64

 
(82
)
 
(6
)
 
(24
)
 
14

 
(40
)
 
(1
)
 
(27
)
Net Assets (Liabilities) as of March 31
$
(10
)
 
$
(34
)
 
$
1

 
$
(43
)
 
$
(34
)
 
$
(9
)
 
$
2

 
$
(41
)
The amount of total gains (losses) included in net income attributed to the change in unrealized gains (losses) related to assets and liabilities held at March 31, 2014 and 2013 and reflected in Operating revenues and Fuel, purchased power and gas in the Consolidated Statements of Operations
$

 
$
(20
)
 
$

 
$
(20
)
 
$
(5
)
 
$
(6
)
 
$

 
$
(11
)

16


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Derivatives are transferred between levels primarily due to changes in the source data used to construct price curves as a result of changes in market liquidity. Transfers in and transfers out are reflected as if they had occurred at the beginning of the period. The following table shows transfers between the levels of the fair value hierarchy for the three months ended March 31, 2014 and 2013:
 
Three Months Ended March 31, 2014
Three Months Ended March 31, 2013
 
Level 1
 
Level 2
 
Level 3
 
Level 1
 
Level 2
 
Level 3
 
(In millions)
Transfers into Level 1 from
$ N/A

 
$

 
$

 
$ N/A

 
$

 
$

Transfers into Level 2 from

 
N/A

 

 

 
N/A

 
2

Transfers into Level 3 from

 

 
N/A

 

 

 
N/A


The following table presents the unobservable inputs related to Level 3 assets and liabilities as of March 31, 2014:
 
 
March 31, 2014
 
 
 
 
 
 
 
 
 
 
Commodity Contracts
 
Derivative Assets
 
Derivative Liabilities
 
Valuation Techniques
 
Unobservable Input
 
Range
 
Weighted Average
 
 
(In millions)
 
 
 
 
 
 
 
 
 
 
Natural Gas
 
$
60

 
$
(70
)
 
Discounted Cash Flow
 
Forward basis price (per MMBtu)
 
$
(1.50
)
$
1.50
/MMBtu
 
$
(0.17
)/MMBtu
Electricity
 
$
77

 
$
(111
)
 
Discounted Cash Flow
 
Forward basis price (per MWh)
 
$
(3
)
$
23
/MWh
 
$
5
/MWh

The following table presents the unobservable inputs related to Level 3 assets and liabilities as of December 31, 2013:
 
 
December 31, 2013
 
 
 
 
 
 
 
 
 
 
Commodity Contracts
 
Derivative Assets
 
Derivative Liabilities
 
Valuation Techniques
 
Unobservable Input
 
Range
 
Weighted Average
 
 
(In millions)
 
 
 
 
 
 
 
 
 
 
Natural Gas
 
$
34

 
$
(86
)
 
Discounted Cash Flow
 
Forward basis price (per MMBtu)
 
$
(0.88
)
$
5.07
/MMBtu
 
$
(0.16
)/MMBtu
Electricity
 
$
139

 
$
(126
)
 
Discounted Cash Flow
 
Forward basis price (per MWh)
 
$
(7
)
$
15
/MWh
 
$
3
/MWh

The unobservable inputs used in the fair value measurement of the electricity and natural gas commodity types consist of inputs that are less observable due in part to lack of available broker quotes, supported by little, if any, market activity at the measurement date or are based on internally developed models. Certain basis prices (i.e. the difference in pricing between two locations) included in the valuation of natural gas and electricity contracts were deemed unobservable.

The inputs listed above would have a direct impact on the fair values of the above security types if they were adjusted. A significant increase (decrease) in the basis price would result in a higher (lower) fair value for long positions, with offsetting impacts to short positions.

Fair Value of Financial Instruments

The fair value of financial instruments included in the table below is determined by using quoted market prices when available. When quoted prices are not available, pricing services may be used to determine the fair value with reference to observable interest rate indexes. DTE Energy has obtained an understanding of how the fair values are derived. DTE Energy also selectively corroborates the fair value of its transactions by comparison of market-based price sources. Discounted cash flow analyses based upon estimated current borrowing rates are also used to determine fair value when quoted market prices are not available. The fair values of notes receivable, excluding capital leases, are estimated using discounted cash flow techniques that incorporate market interest rates as well as assumptions about the remaining life of the loans and credit risk. Depending on the information available, other valuation techniques may be used that rely on internal assumptions and models. Valuation policies and procedures are determined by DTE Energy's Treasury Department which reports to the Company's Vice President and Treasurer.


17


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The following table presents the carrying amount and fair value of financial instruments as of March 31, 2014 and December 31, 2013:
 
March 31, 2014
 
December 31, 2013
 
Carrying
 
Fair Value
 
Carrying
 
Fair Value
 
Amount
 
Level 1
 
Level 2
 
Level 3
 
Amount
 
Level 1
 
Level 2
 
Level 3
 
(In millions)
Notes receivable, excluding capital leases
$
43

 
$

 
$

 
$
43

 
$
41

 
$

 
$

 
$
41

Dividends payable
$
116

 
$
116

 
$

 
$

 
$
116

 
$
116

 
$

 
$

Short-term borrowings
$
375

 
$

 
$
375

 
$

 
$
131

 
$

 
$
131

 
$

Long-term debt
$
7,979

 
$
461

 
$
7,398

 
$
743

 
$
8,094

 
$
425

 
$
7,551

 
$
499


See Note 4 for further fair value information on financial and derivative instruments.

Nuclear Decommissioning Trust Funds

DTE Electric has a legal obligation to decommission its nuclear power plants following the expiration of their operating licenses. This obligation is reflected as an asset retirement obligation on the Consolidated Statements of Financial Position. Rates approved by the MPSC provide for the recovery of decommissioning costs of Fermi 2 and the disposal of low-level radioactive waste. DTE Electric is continuing to fund FERC jurisdictional amounts for decommissioning even though explicit provisions are not included in FERC rates.

The following table summarizes the fair value of the nuclear decommissioning trust fund assets:
 
March 31,
2014
 
December 31, 2013
 
(In millions)
Fermi 2
$
1,174

 
$
1,172

Fermi 1
3

 
3

Low level radioactive waste
18

 
16

Total
$
1,195

 
$
1,191


The costs of securities sold are determined on the basis of specific identification. The following table sets forth the gains and losses and proceeds from the sale of securities by the nuclear decommissioning trust funds:
 
Three Months Ended March 31,
 
2014
 
2013
 
(In millions)
Realized gains
$
9

 
$
8

Realized losses
$
(7
)
 
$
(7
)
Proceeds from sales of securities
$
271

 
$
136


Realized gains and losses from the sale of securities for the Fermi 2 and the low-level radioactive waste funds are recorded to the Regulatory asset and Nuclear decommissioning liability. The following table sets forth the fair value and unrealized gains for the nuclear decommissioning trust funds:
 
March 31, 2014
 
December 31, 2013
 
Fair
Value
 
Unrealized
Gains
 
Fair
Value
 
Unrealized
Gains
 
(In millions)
Equity securities
$
730

 
$
197

 
$
730

 
$
201

Debt securities
452

 
16

 
442

 
12

Cash and cash equivalents
13

 

 
19

 

 
$
1,195

 
$
213

 
$
1,191

 
$
213



18


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The debt securities at March 31, 2014 and December 31, 2013 had an average maturity of approximately 7 years, respectively. Securities held in the nuclear decommissioning trust funds are classified as available-for-sale. As DTE Electric does not have the ability to hold impaired investments for a period of time sufficient to allow for the anticipated recovery of market value, all unrealized losses are considered to be other-than-temporary impairments.

Unrealized losses incurred by the Fermi 2 trust are recognized as a Regulatory asset. DTE Electric recognized $33 million and $31 million of unrealized losses as Regulatory assets at March 31, 2014 and December 31, 2013, respectively. Since the decommissioning of Fermi 1 is funded by DTE Electric rather than through a regulatory recovery mechanism, there is no corresponding regulatory asset treatment. Therefore, unrealized losses incurred by the Fermi 1 trust are recognized in earnings immediately. There were no unrealized losses recognized in the three months ended March 31, 2014 and 2013 for Fermi 1.

Other Securities

At March 31, 2014 and December 31, 2013, the securities were comprised primarily of money market and equity securities. During the three months ended March 31, 2014 and 2013, no amounts of unrealized losses on available-for-sale securities were reclassified out of other comprehensive income and realized into net income for the periods. Gains related to trading securities held at March 31, 2014 and 2013 were $2 million and $8 million, respectively.


NOTE 4 — FINANCIAL AND OTHER DERIVATIVE INSTRUMENTS

The Company recognizes all derivatives at their fair value as Derivative assets or liabilities on the Consolidated Statements of Financial Position unless they qualify for certain scope exceptions, including the normal purchases and normal sales exception. Further, derivatives that qualify and are designated for hedge accounting are classified as either hedges of a forecasted transaction or the variability of cash flows to be received or paid related to a recognized asset or liability (cash flow hedge), or as hedges of the fair value of a recognized asset or liability or of an unrecognized firm commitment (fair value hedge). For cash flow hedges, the portion of the derivative gain or loss that is effective in offsetting the change in the value of the underlying exposure is deferred in Accumulated other comprehensive income and later reclassified into earnings when the underlying transaction occurs. Gains or losses from the ineffective portion of cash flow hedges are recognized in earnings immediately. For fair value hedges, changes in fair values for the derivative and hedged item are recognized in earnings each period. For derivatives that do not qualify or are not designated for hedge accounting, changes in fair value are recognized in earnings each period.

The Company’s primary market risk exposure is associated with commodity prices, credit, and interest rates. The Company has risk management policies to monitor and manage market risks. The Company uses derivative instruments to manage some of the exposure. The Company uses derivative instruments for trading purposes in its Energy Trading segment. Contracts classified as derivative instruments include electricity, natural gas, oil and certain coal forwards, futures, options and swaps, and foreign currency exchange contracts. Items not classified as derivatives include natural gas inventory, pipeline transportation contracts, renewable energy credits and natural gas storage assets.

Electric — DTE Electric generates, purchases, distributes and sells electricity. DTE Electric uses forward energy contracts to manage changes in the price of electricity and fuel. Substantially all of these contracts meet the normal purchases and sales exemption and are therefore accounted for under the accrual method. Other derivative contracts are MTM and recoverable through the PSCR mechanism when settled. This results in the deferral of unrealized gains and losses as Regulatory assets or liabilities until realized.

Gas — DTE Gas purchases, stores, transports, distributes and sells natural gas and sells storage and transportation capacity. DTE Gas has fixed-priced contracts for portions of its expected natural gas supply requirements through March 2017. Substantially all of these contracts meet the normal purchases and sales exemption and are therefore accounted for under the accrual method. DTE Gas may also sell forward transportation and storage capacity contracts. Forward transportation and storage contracts are generally not derivatives and are therefore accounted for under the accrual method.

Gas Storage and Pipelines — This segment is primarily engaged in services related to the transportation and storage of natural gas. Primarily fixed-priced contracts are used in the marketing and management of transportation and storage services. Generally these contracts are not derivatives and are therefore accounted for under the accrual method.


19


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Power and Industrial Projects — This segment manages and operates energy and pulverized coal projects, coke batteries, reduced emissions fuel projects, landfill gas recovery and power generation assets. Primarily fixed-price contracts are used in the marketing and management of the segment assets. These contracts are generally not derivatives and are therefore accounted for under the accrual method.

Energy Trading — Commodity Price Risk — Energy Trading markets and trades electricity, coal, natural gas physical products and energy financial instruments, and provides energy and asset management services utilizing energy commodity derivative instruments. Forwards, futures, options and swap agreements are used to manage exposure to the risk of market price and volume fluctuations in its operations. These derivatives are accounted for by recording changes in fair value to earnings unless hedge accounting criteria are met.

Energy Trading — Foreign Currency Exchange Risk — Energy Trading has foreign currency exchange forward contracts to economically hedge fixed Canadian dollar commitments existing under natural gas and power purchase and sale contracts and natural gas transportation contracts. The Company enters into these contracts to mitigate price volatility with respect to fluctuations of the Canadian dollar relative to the U.S. dollar. These derivatives are accounted for by recording changes in fair value to earnings unless hedge accounting criteria are met.

Corporate and Other — Interest Rate Risk — The Company uses interest rate swaps, treasury locks and other derivatives to hedge the risk associated with interest rate market volatility. In 2004 and 2000, the Company entered into a series of interest rate derivatives to limit its sensitivity to market interest rate risk associated with the issuance of long-term debt. Such instruments were designated as cash flow hedges. The Company subsequently issued long-term debt and terminated these hedges at a cost that is included in Other comprehensive loss. Amounts recorded in Other comprehensive loss will be reclassified to interest expense through 2033. In 2014, the Company estimates reclassifying less than $1 million of losses to earnings.

Credit Risk — The utility and non-utility businesses are exposed to credit risk if customers or counterparties do not comply with their contractual obligations. The Company maintains credit policies that significantly minimize overall credit risk. These policies include an evaluation of potential customers’ and counterparties’ financial condition, credit rating, collateral requirements or other credit enhancements such as letters of credit or guarantees. The Company generally uses standardized agreements that allow the netting of positive and negative transactions associated with a single counterparty. The Company maintains a provision for credit losses based on factors surrounding the credit risk of its customers, historical trends, and other information. Based on the Company’s credit policies and its March 31, 2014 provision for credit losses, the Company’s exposure to counterparty nonperformance is not expected to have a material adverse effect on the Company’s financial statements.

Derivative Activities

The Company manages its MTM risk on a portfolio basis based upon the delivery period of its contracts and the individual components of the risks within each contract. Accordingly, it records and manages the energy purchase and sale obligations under its contracts in separate components based on the commodity (e.g. electricity or natural gas), the product (e.g. electricity for delivery during peak or off-peak hours), the delivery location (e.g. by region), the risk profile (e.g. forward or option), and the delivery period (e.g. by month and year). The following describes the categories of activities represented by their operating characteristics and key risks:

Asset Optimization — Represents derivative activity associated with assets owned and contracted by DTE Energy, including forward natural gas purchases and sales, natural gas transportation and storage capacity. Changes in the value of derivatives in this category typically economically offset changes in the value of underlying non-derivative positions, which do not qualify for fair value accounting. The difference in accounting treatment of derivatives in this category and the underlying non-derivative positions can result in significant earnings volatility.

Marketing and Origination — Represents derivative activity transacted by originating substantially hedged positions with wholesale energy marketers, producers, end users, utilities, retail aggregators and alternative energy suppliers.

Fundamentals Based Trading — Represents derivative activity transacted with the intent of taking a view, capturing market price changes, or putting capital at risk. This activity is speculative in nature as opposed to hedging an existing exposure.

20


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)


Other — Includes derivative activity at DTE Electric related to FTRs. Changes in the value of derivative contracts at DTE Electric are recorded as Derivative Assets or Liabilities, with an offset to Regulatory Assets or Liabilities as the settlement value of these contracts will be included in the PSCR mechanism when realized.

The following tables present the fair value of derivative instruments as of March 31, 2014 and December 31, 2013:
 
March 31, 2014
 
December 31, 2013
 
Derivative
Assets
 
Derivative Liabilities
 
Derivative
Assets
 
Derivative Liabilities
 
(In millions)
Derivatives not designated as hedging instruments:
 
 
 
 
 
 
 
Foreign currency exchange contracts
$

 
$
(4
)
 
$

 
$
(1
)
Commodity Contracts:
 
 
 
 
 

 
 

Natural Gas
$
383

 
$
(416
)
 
$
396

 
$
(503
)
Electricity
503

 
(524
)
 
400

 
(398
)
Other
40

 
(40
)
 
37

 
(34
)
Total derivatives not designated as hedging instruments:
$
926

 
$
(984
)
 
$
833

 
$
(936
)
Total derivatives:
 
 
 
 
 
 
 
Current
$
841

 
$
(899
)
 
$
691

 
$
(773
)
Noncurrent
85

 
(85
)
 
142

 
(163
)
Total derivatives
$
926

 
$
(984
)
 
$
833

 
$
(936
)

Certain of the Company's derivative positions are subject to netting arrangements which provide for offsetting of asset and liability positions as well as related cash collateral. Such netting arrangements generally do not have restrictions. Under such netting arrangements, the Company offsets the fair value of derivative instruments with cash collateral received or paid for those contracts executed with the same counterparty, which reduces the Company's total assets and liabilities. Cash collateral is allocated between the fair value of derivative instruments and customer accounts receivable and payable with the same counterparty on a pro rata basis to the extent there is exposure. Any cash collateral remaining, after the exposure is netted to zero, is reflected in accounts receivable and accounts payable as collateral paid or received, respectively.

The Company also provides and receives collateral in the form of letters of credit which can be offset against net derivative assets and liabilities as well as accounts receivable and payable. The Company had issued letters of credit of approximately $18 million and $19 million at March 31, 2014 and December 31, 2013, respectively, which could be used to offset net derivative liabilities. Letters of credit received from third parties which could be used to offset our net derivative assets were not material for the periods presented. Such balances of letters of credit are excluded from the tables below and are not netted with the recognized assets and liabilities in the Consolidated Statements of Financial Position.

For contracts with certain clearing agents the fair value of derivative instruments is netted against realized positions with the net balance reflected as either 1) a derivative asset or liability or 2) an account receivable or payable. Other than certain clearing agents, accounts receivable and accounts payable that are subject to netting arrangements have not been offset against the fair value of derivative assets and liabilities. Certain contracts that have netting arrangements have not been offset in the Consolidated Statements of Financial Position. The impact of netting these derivative instruments and cash collateral related to such contracts is not material. Only the gross amounts for these derivative instruments are included in the table below.

As of March 31, 2014, the total cash collateral posted, net of cash collateral received, was $128 million. As of December 31, 2013, the total cash collateral posted, net of cash collateral received, was $12 million. As of March 31, 2014, derivative assets and derivative liabilities are shown net of cash collateral of $6 million and $4 million, respectively. As of December 31, 2013, derivative assets and derivative liabilities are shown net of cash collateral of $26 million and $17 million, respectively. The Company recorded cash collateral paid of $140 million and cash collateral received of $10 million not related to unrealized derivative positions as of March 31, 2014. The Company recorded cash collateral paid of $34 million and cash collateral received of $13 million not related to unrealized derivative positions as of December 31, 2013. These amounts are included in accounts receivable and accounts payable and are recorded net by counterparty.


21


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The following table presents the netting offsets of derivative assets and liabilities at March 31, 2014 and December 31, 2013:
 
March 31, 2014
 
December 31, 2013
 
Gross Amounts of Recognized Assets (Liabilities)
 
Gross Amounts Offset in the Consolidated Statements of Financial Position
 
Net Amounts of Assets (Liabilities) Presented in the Consolidated Statements of Financial Position
 
Gross Amounts of Recognized Assets (Liabilities)
 
Gross Amounts Offset in the Consolidated Statements of Financial Position
 
Net Amounts of Assets (Liabilities) Presented in the Consolidated Statements of Financial Position
 
(In millions)
Derivative assets:
 
 
 
 
 
 
 
 
 
 
 
Commodity Contracts:
 
 
 
 
 
 
 
 
 
 
 
Natural Gas
$
383

 
$
(367
)
 
$
16

 
$
396

 
$
(382
)
 
$
14

Electricity
503

 
(422
)
 
81

 
400

 
(291
)
 
109

Other
40

 
(41
)
 
(1
)
 
37

 
(34
)
 
3

Total derivative assets
$
926

 
$
(830
)
 
$
96

 
$
833

 
$
(707
)
 
$
126

 
 
 
 
 
 
 
 
 
 
 
 
Derivative liabilities:
 
 
 
 
 
 
 
 
 
 
 
Commodity Contracts:
 
 
 
 
 
 
 
 
 
 
 
Natural Gas
$
(416
)
 
$
369

 
$
(47
)
 
$
(503
)
 
$
395

 
$
(108
)
Electricity
(524
)
 
417

 
(107
)
 
(398
)
 
269

 
(129
)
Other
(40
)
 
41

 
1

 
(34
)
 
34

 

Other derivative liabilities
(4
)
 
1

 
(3
)
 
(1
)
 

 
(1
)
Total derivative liabilities
$
(984
)
 
$
828

 
$
(156
)
 
$
(936
)
 
$
698

 
$
(238
)

The following table presents the netting offsets of derivative assets and liabilities at March 31, 2014 and December 31, 2013:
 
March 31, 2014
 
December 31, 2013
 
Derivative Assets
 
Derivative Liabilities
 
Derivative Assets
 
Derivative Liabilities
 
Current
 
Noncurrent
 
Current
 
Noncurrent
 
Current
 
Noncurrent
 
Current
 
Noncurrent
 
(In millions)
Reconciliation of derivative instruments to Consolidated Statements of Financial Position:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Total fair value of derivatives
$
841

 
$
85

 
$
(899
)
 
$
(85
)
 
$
691

 
$
142

 
$
(773
)
 
$
(163
)
Counterparty netting
(756
)
 
(68
)
 
756

 
68

 
(566
)
 
(115
)
 
566

 
115

Collateral adjustment
(6
)
 

 
3

 
1

 
(26
)
 

 
12

 
5

Total derivatives as reported
$
79

 
$
17

 
$
(140
)
 
$
(16
)
 
$
99

 
$
27

 
$
(195
)
 
$
(43
)

The effect of derivatives not designated as hedging instruments on the Consolidated Statements of Operations for the three months ended March 31, 2014 and 2013 is as follows:
 
 
Location of Gain
(Loss) Recognized
in Income on Derivatives
 
Gain (Loss)
Recognized in
Income on
Derivatives for
the Three Months Ended March 31,
Derivatives not Designated as Hedging Instruments
 
 
2014
 
2013
 
 
 
 
(In millions)
Foreign currency exchange contracts
 
Operating Revenue
 
$
(4
)
 
$

Commodity Contracts:
 
 
 
 
 
 
Natural Gas
 
Operating Revenue
 
(127
)
 
(10
)
Natural Gas
 
Fuel, purchased power and gas
 
20

 
14

Electricity
 
Operating Revenue
 
133

 
20

Other
 
Operating Revenue
 
(1
)
 
1

Total
 
 
 
$
21

 
$
25


22


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Revenues and energy costs related to trading contracts are presented on a net basis in the Consolidated Statements of Operations. Commodity derivatives used for trading purposes, and financial non-trading commodity derivatives, are accounted for using the mark-to-market method with unrealized and realized gains and losses recorded in Operating revenues. Non-trading physical commodity sale and purchase derivative contracts are generally accounted for using the mark-to-market method with unrealized and realized gains and losses for sales recorded in Operating revenue and purchases recorded in Fuel, purchased power and gas.

The effects of derivative instruments recoverable through the PSCR mechanism when realized on the Consolidated Statements of Financial Position were $4 million and $1 million in unrealized gains related to FTRs recognized in Regulatory liabilities for the three months ended March 31, 2014 and 2013, respectively.

The following represents the cumulative gross volume of derivative contracts outstanding as of March 31, 2014:
Commodity
 
Number of Units
Natural Gas (MMBtu)
 
898,351,691
Electricity (MWh)
 
39,480,560
Foreign Currency Exchange ($ CAD)
 
91,295,991

Various subsidiaries of the Company have entered into contracts which contain ratings triggers and are guaranteed by DTE Energy. These contracts contain provisions which allow the counterparties to require that the Company post cash or letters of credit as collateral in the event that DTE Energy’s credit rating is downgraded below investment grade. Certain of these provisions (known as “hard triggers”) state specific circumstances under which the Company can be required to post collateral upon the occurrence of a credit downgrade, while other provisions (known as “soft triggers”) are not as specific. For contracts with soft triggers, it is difficult to estimate the amount of collateral which may be requested by counterparties and/or which the Company may ultimately be required to post. The amount of such collateral which could be requested fluctuates based on commodity prices (primarily natural gas, power and coal) and the provisions and maturities of the underlying transactions. As of March 31, 2014, DTE Energy's contractual obligation to post collateral in the form of cash or letter of credit in the event of a downgrade to below investment grade, under both hard trigger and soft trigger provisions, was approximately $444 million.

As of March 31, 2014, the Company had approximately $1,089 million of derivatives in net liability positions, for which hard triggers exist. Collateral of approximately $15 million has been posted against such liabilities, including cash and letters of credit. Associated derivative net asset positions for which contractual offset exists were approximately $959 million. The net remaining amount of approximately $115 million is derived from the $444 million noted above.


NOTE 5 — ASSET RETIREMENT OBLIGATIONS

A reconciliation of the asset retirement obligations for the three months ended March 31, 2014 follows:
 
(In millions)
Asset retirement obligations at December 31, 2013
$
1,827

Accretion
28

Liabilities incurred
4

Revision in estimated cash flows
(5
)
Asset retirement obligations at March 31, 2014
$
1,854



23


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)


NOTE 6 — REGULATORY MATTERS

Refundable Revenue Decoupling/ Deferred Gain Amortization

In September 2012, the MPSC approved DTE Electric's accounting application to defer for future amortization the gain resulting from the reversal of the Company's $127 million regulatory liability associated with the operation of the RDM. The approved application provided for the amortization of the regulatory liability to income, at a monthly rate of approximately $10.6 million, beginning January 2014. On April 1, 2014, the MPSC approved DTE Electric's accounting application to suspend the amortization of the RDM regulatory liability as of June 30, 2014 and to complete the amortization over the period January 2015 to June 2015. If DTE Electric's base rates are increased prior to July 1, 2015, the Company will cease amortization and refund to customers the remaining unamortized balance of the regulatory liability.

PSCR Proceedings

The PSCR process is designed to allow DTE Electric to recover all of its power supply costs if incurred under reasonable and prudent policies and practices. DTE Electric's power supply costs include fuel and related transportation costs, purchased and net interchange power costs, nitrogen oxide and sulfur dioxide emission allowances costs, urea costs, transmission costs and MISO costs. The MPSC reviews these costs, policies and practices for prudence in annual plan and reconciliation filings.

2012 PSCR Year — In March 2013, DTE Electric filed the 2012 PSCR reconciliation calculating a net under-recovery of approximately $87 million that includes an under-recovery of approximately $148 million for the 2011 PSCR year. The reconciliation includes purchased power costs related to the manual shutdown of our Fermi 2 nuclear power plant in June 2012 caused by the failure of one of the plant's two non-safety related feed-water pumps. The plant was restarted on July 30, 2012, which restored production to nominal 68% of full capacity. In September 2013, the repair to the plant was completed and production was returned to full capacity. DTE Electric was able to purchase sufficient power from MISO to continue to provide uninterrupted service to our customers. Certain intervenors in the reconciliation case have challenged the recovery of up to $32 million of the Fermi-related purchased power costs. Resolution of this matter is expected in 2014.

2013 PSCR Year — In March 2014, DTE Electric filed the 2013 PSCR reconciliation calculating a net over-recovery of $54 million that includes an under-recovery of $87 million for the 2012 PSCR year.


24


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)


NOTE 7 — EARNINGS PER SHARE

The Company reports both basic and diluted earnings per share. The calculation of diluted earnings per share assumes the issuance of potentially dilutive common shares outstanding during the period from the exercise of stock options. A reconciliation of both calculations is presented in the following table for the three months ended March 31:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions, except per share amounts)
Basic Earnings per Share
 
 
 
Net income attributable to DTE Energy Company
$
326

 
$
234

Average number of common shares outstanding
177

 
173

Weighted average net restricted shares outstanding

 
1

Dividends declared — common shares
$
116

 
$
107

Dividends declared — net restricted shares

 
1

Total distributed earnings
$
116

 
$
108

Net income less distributed earnings
$
210

 
$
126

Distributed (dividends per common share)
$
0.66

 
$
0.62

Undistributed
1.18

 
0.73

Total Basic Earnings per Common Share
$
1.84

 
$
1.35

Diluted Earnings per Share
 
 
 
Net income attributable to DTE Energy Company
$
326

 
$
234

Average number of common shares outstanding
177

 
173

Weighted average net restricted shares outstanding

 
1

Dividends declared — common shares
$
116

 
$
107

Dividends declared — net restricted shares

 
1

Total distributed earnings
$
116

 
$
108

Net income less distributed earnings
$
210

 
$
126

Distributed (dividends per common share)
$
0.66

 
$
0.62

Undistributed
1.18

 
0.72

Total Diluted Earnings per Common Share
$
1.84

 
$
1.34



NOTE 8 — LONG-TERM DEBT

Debt Issuances

In March 2014, DTE Electric agreed to issue $150 million of 4.60%, 30-year mortgage bonds and $100 million of 3.77%, 12-year mortgage bonds to a group of institutional investors in a private placement transaction. The bonds are expected to close and fund in June 2014. Proceeds will be used for the repayment of existing indebtedness and for general corporate purposes.

Debt Redemptions

In 2014, the following debt was redeemed:
Company
 
Month
 
Type
 
Interest Rate
 
Maturity
 
Amount
 
 
 
 
 
 
 
 
 
 
(In millions)
DTE Electric
 
March
 
Mortgage Bonds
 
Various

 
2014
 
13

DTE Electric
 
March
 
Securitization Bonds
 
6.62
%
 
2014
 
100

DTE Energy
 
Various
 
Other Long Term Debt
 
Various

 
2014
 
2

 
 
 
 
 
 
 
 
 
 
$
115



25


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

In April 2014, DTE Electric called $31 million of 2.35% tax exempt revenue bonds and $32 million of 4.65% tax exempt revenue bonds with final maturities of 2024 and 2028, respectively.


NOTE 9 — SHORT-TERM CREDIT ARRANGEMENTS AND BORROWINGS

DTE Energy and its wholly owned subsidiaries, DTE Electric and DTE Gas, have unsecured revolving credit agreements with a syndicate of 19 banks that can be used for general corporate borrowings, but are intended to provide liquidity support for each of the companies’ commercial paper programs. No one bank provides more than 8.7% of the commitment in any facility. Borrowings under the facilities are available at prevailing short-term interest rates. Additionally, DTE Energy has other facilities to support letter of credit issuance.

The agreements require the Company to maintain a total funded debt to capitalization ratio of no more than 0.65 to 1. In the agreements, “total funded debt” means all indebtedness of the Company and its consolidated subsidiaries, including capital lease obligations, hedge agreements and guarantees of third parties’ debt, but excluding contingent obligations, nonrecourse and junior subordinated debt and certain equity-linked securities and, except for calculations at the end of the second quarter, certain DTE Gas short-term debt. “Capitalization” means the sum of (a) total funded debt plus (b) “consolidated net worth,” which is equal to consolidated total stockholders’ equity of the Company and its consolidated subsidiaries (excluding pension effects under certain FASB statements), as determined in accordance with accounting principles generally accepted in the United States of America. At March 31, 2014, the total funded debt to total capitalization ratios for DTE Energy, DTE Electric and DTE Gas are 0.48 to 1, 0.50 to 1 and 0.46 to 1, respectively, and are in compliance with this financial covenant. The availability under the facilities in place at March 31, 2014 is shown in the following table:
 
DTE Energy
 
DTE Electric
 
DTE Gas
 
Total
 
(In millions)
Unsecured letter of credit facility, expiring in February 2015
$
100

 
$

 
$

 
$
100

Unsecured letter of credit facility, expiring in August 2015
125

 

 

 
125

Unsecured revolving credit facility, expiring April 2018
1,200

 
300

 
300

 
1,800

 
1,425

 
300

 
300

 
2,025

Amounts outstanding at March 31, 2014:
 
 
 
 
 
 
 
Commercial paper issuances
375

 

 

 
375

Letters of credit
195

 

 

 
195

 
570

 

 

 
570

Net availability at March 31, 2014
$
855

 
$
300

 
$
300

 
$
1,455


In February 2014, DTE Energy increased its $50 million unsecured letter of credit facility to $100 million. The expiration date was also amended from May 2014 to February 2015.

The Company has other outstanding letters of credit which are not included in the above described facilities totaling approximately $66 million which are used for various corporate purposes.

In conjunction with maintaining certain exchange traded risk management positions, the Company may be required to post cash collateral with its clearing agent. The Company has a demand financing agreement for up to $100 million with its clearing agent. The agreement, as amended, also allows for up to $50 million of additional margin financing provided that the Company posts a letter of credit for the incremental amount. At March 31, 2014, a $50 million letter of credit was in place, raising the capacity under this facility to $150 million. The $50 million letter of credit is included in the table above. The amount outstanding under this agreement was $117 million and $138 million at March 31, 2014 and December 31, 2013, respectively.


26


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

NOTE 10 — COMMITMENTS AND CONTINGENCIES

Environmental

Electric

Air - DTE Electric is subject to the EPA ozone and fine particulate transport and acid rain regulations that limit power plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, the EPA and the State of Michigan have issued additional emission reduction regulations relating to ozone, fine particulate, regional haze, mercury, and other air pollution. These rules have led to additional controls on fossil-fueled power plants to reduce nitrogen oxide, sulfur dioxide, mercury and other emissions. To comply with these requirements, DTE Electric spent approximately $2 billion through 2013. The Company estimates DTE Electric will make capital expenditures of approximately $280 million in 2014 and up to approximately $1.2 billion of additional capital expenditures through 2021 based on current regulations. Further, additional rulemakings are expected over the next few years which could require additional controls for sulfur dioxide, nitrogen oxides and other hazardous air pollutants. The Cross State Air Pollution Rule (CSAPR), finalized in July 2011, required further reductions of sulfur dioxide and nitrogen oxides emissions beginning in 2012. On December 30, 2011, the U.S. Court of Appeals for the District of Columbia (D.C.) Circuit granted the motions to stay the rule, leaving DTE Electric temporarily subject to the previously existing Clean Air Interstate Rule (CAIR). On August 21, 2012, the Court issued its decision, vacating CSAPR and leaving CAIR in place. The EPA's petition seeking a rehearing of the U.S. Court of Appeals' decision regarding the CSAPR was denied on January 24, 2013. On June 24, 2013, the U.S. Supreme Court granted EPA's petition asking the Court to review the D.C. Circuit Court's decision on CSAPR. A ruling by the Supreme Court is expected by the second quarter of 2014. Notwithstanding the appeal filed with the Supreme Court, the EPA and a number of states, including Michigan, have started working on the framework of revised CSAPR regulations which we anticipate to be proposed in the next few years.

The Mercury and Air Toxics Standard (MATS) rule, formerly known as the Electric Generating Unit Maximum Achievable Control Technology (EGU MACT) Rule was finalized on December 16, 2011. The MATS rule requires reductions of mercury and other hazardous air pollutants beginning in April 2015, with a potential extension to April 2016. DTE Electric has requested and been granted compliance date extensions for all relevant units to April 2016. DTE Electric has tested technologies to determine technological and economic feasibility as MATS compliance alternatives to Flue Gas Desulfurization (FGD) systems. Implementation of Dry Sorbent Injection (DSI) and Activated Carbon Injection (ACI) technologies will allow several units that would not have been economical for FGD installations to continue operation in compliance with MATS.

In July 2009, DTE Energy received a NOV/FOV from the EPA alleging, among other things, that five DTE Electric power plants violated New Source Performance standards, Prevention of Significant Deterioration requirements, and operating permit requirements under the Clean Air Act. In June 2010, the EPA issued a NOV/FOV making similar allegations related to a project and outage at Unit 2 of the Monroe Power Plant. In March 2013, DTE Energy received a supplemental NOV from the EPA relating to the July 2009 NOV/FOV. The supplemental NOV alleged additional violations relating to the New Source Review provisions under the Clean Air Act, among other things.


27


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

In August 2010, the U.S. Department of Justice, at the request of the EPA, brought a civil suit in the U.S. District Court for the Eastern District of Michigan against DTE Energy and DTE Electric, related to the June 2010 NOV/FOV and the outage work performed at Unit 2 of the Monroe Power Plant, but not relating to the July 2009 NOV/FOV. Among other relief, the EPA requested the court to require DTE Electric to install and operate the best available control technology at Unit 2 of the Monroe Power Plant. Further, the EPA requested the court to issue a preliminary injunction to require DTE Electric to (i) begin the process of obtaining the necessary permits for the Monroe Unit 2 modification and (ii) offset the pollution from Monroe Unit 2 through emissions reductions from DTE Electric's fleet of coal-fired power plants until the new control equipment is operating. On August 23, 2011, the U.S. District Court judge granted DTE Energy's motion for summary judgment in the civil case, dismissing the case and entering judgment in favor of DTE Energy and DTE Electric. On October 20, 2011, the EPA caused to be filed a Notice of Appeal to the U.S. Court of Appeals for the Sixth Circuit. On March 28, 2013, the Court of Appeals remanded the case to the U.S. District Court for review of the procedural component of the New Source Review notification requirements. On September 3, 2013, the EPA caused to be filed a motion seeking leave to amend their complaint regarding the June 2010 NOV/FOV adding additional claims related to outage work performed at the Trenton Channel and Belle River power plants as well as additional claims related to work performed at the Monroe Power Plant. In addition, the Sierra Club caused to be filed a motion to add a claim regarding the River Rouge Power Plant. On March 3, 2014, the U.S. District Court judge granted again DTE Energy's motion for summary judgment dismissing the civil case related to Monroe Unit 2. On April 3, 2014, the U.S. District Court judge granted motions filed by the EPA and the Sierra Club to amend their New Source Review complaint adding additional claims for Monroe Units 1, 2 and 3, Belle River Units 1 and 2, Trenton Channel Unit 9 and River Rouge Unit 3.

DTE Energy and DTE Electric believe that all the plants and generating units identified by the EPA and the Sierra Club have complied with all applicable federal environmental regulations. Depending upon the outcome of discussions with the EPA regarding the two NOVs/FOVs, DTE Electric could be required to install additional pollution control equipment at some or all of the power plants in question, implement early retirement of facilities where control equipment is not economical, engage in supplemental environmental programs, and/or pay fines. The Company cannot predict the financial impact or outcome of this matter, or the timing of its resolution.

In March 2013, the Sierra Club filed suit against DTE Energy and DTE Electric alleging violations of the Clean Air Act at four of DTE Electric's coal-fired power plants. The plaintiffs allege 1,499 six-minute periods of excess opacity of air emissions from 2007-2012 at those facilities. The suit asks that the court enjoin DTE Energy and DTE Electric from operating the power plants except in complete compliance with applicable laws and permit requirements, pay civil penalties, conduct beneficial environmental mitigation projects, pay attorney fees and require the installation of any necessary pollution controls or to convert and/or operate the plants' boilers on natural gas to avoid additional violations and to off-set historic unlawful emissions. In December 2013, a U.S. District Court judge issued an order dismissing, without prejudice, the plaintiff's complaint allowing them to file an amended complaint by January 17, 2014. The order dismissing the complaint resulted from a considerable number of plaintiff's claims being time barred based on the statute of limitations. On January 17, 2014, the plaintiffs filed an amended complaint for the period January 13, 2008 - June 30, 2012, reducing the total number of six-minute periods from 1,499 to 1,139. DTE Energy and DTE Electric filed an answer to the amended complaint on March 11, 2014. The resolution of this matter is not expected to have a material effect on the Company's operations or financial statements.

Water — In response to an EPA regulation, DTE Electric would be required to examine alternatives for reducing the environmental impacts of the cooling water intake structures at several of its facilities. Based on the results of completed studies and expected future studies, DTE Electric may be required to install technologies to reduce the impacts of the water intake structures. The initial rule published in 2004 was subsequently remanded and a proposed rule published in 2011. The proposed rule specified an eight year compliance timeline. Final action on this rule has been delayed and is expected in 2014. Depending on final regulations, its requirements may require modifications to some existing intake structures and could impact the rates we charge our customers. It is not possible to quantify the impact of those expected rulemakings at this time.

On April 19, 2013, the EPA proposed revised steam electric effluent guidelines regulating wastewater streams from coal-fired power plants including multiple possible options for compliance. The rules are expected to be finalized by December 2014. DTE Electric has provided comments to the EPA. However, it is not possible at this time to quantify the impacts of these developing requirements.


28


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Contaminated and Other Sites — Prior to the construction of major interstate natural gas pipelines, gas for heating and other uses was manufactured locally from processes involving coal, coke or oil. The facilities, which produced gas, have been designated as manufactured gas plant (MGP) sites. DTE Electric conducted remedial investigations at contaminated sites, including three former MGP sites. The investigations have revealed contamination related to the by-products of gas manufacturing at each site. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites, including the area surrounding an ash landfill, electrical distribution substations, electric generating power plants, and underground and aboveground storage tank locations. The findings of these investigations indicated that the estimated cost to remediate these sites is expected to be incurred over the next several years. At March 31, 2014 and December 31, 2013, the Company had $9 million and $8 million accrued for remediation, respectively. Any change in assumptions, such as remediation techniques, nature and extent of contamination and regulatory requirements, could impact the estimate of remedial action costs for the sites and affect the Company’s financial position and cash flows. The Company believes the likelihood of a material change to the accrued amount is remote based on current knowledge of the conditions at each site.

DTE Electric owns and operates three permitted engineered ash storage facilities to dispose of fly ash from the coal fired power plants. The EPA has published proposed rules to regulate coal ash under the authority of the Resources Conservation and Recovery Act (RCRA). The proposed rule published in June 2010 contains two primary regulatory options to regulate coal ash residue. The EPA is currently considering either designating coal ash as a “Hazardous Waste” as defined by RCRA or regulating coal ash as non-hazardous waste under RCRA. Agencies and legislatures have urged the EPA to regulate coal ash as a non-hazardous waste. If the EPA designates coal ash as a hazardous waste, the agency could apply some, or all, of the disposal and reuse standards that have been applied to other existing hazardous wastes to disposal and reuse of coal ash. Some of the regulatory actions currently being contemplated could have a significant impact on our operations and financial position and the rates we charge our customers. The rules are expected to be finalized by December 2014. It is not possible to quantify the impact of those expected rulemakings at this time.

Gas

Contaminated Sites — Gas segment, owns or previously owned, 15 former MGP sites. Investigations have revealed contamination related to the by-products of gas manufacturing at each site. In addition to the MGP sites, the Company is also in the process of cleaning up other contaminated sites. Cleanup activities associated with these sites will be conducted over the next several years. The MPSC has established a cost deferral and rate recovery mechanism for investigation and remediation costs incurred at former MGP sites. As of March 31, 2014 and December 31, 2013, the Company had $26 million and $28 million accrued for remediation, respectively. Any change in assumptions, such as remediation techniques, nature and extent of contamination and regulatory requirements, could impact the estimate of remedial action costs for the sites and affect the Company’s financial position and cash flows. The Company anticipates the cost amortization methodology approved by the MPSC for DTE Gas, which allows DTE Gas to amortize the MGP costs over a ten-year period beginning with the year subsequent to the year the MGP costs were incurred and the cost deferral and rate recovery mechanism for Citizens approved by the City of Adrian, will prevent environmental costs from having a material adverse impact on the Company’s results of operations.

Non-utility

The Company’s non-utility businesses are subject to a number of environmental laws and regulations dealing with the protection of the environment from various pollutants.

The Michigan coke battery facility received and responded to information requests from the EPA that resulted in the issuance of a NOV in June 2007 alleging potential maximum achievable control technologies and new source review violations. The EPA is in the process of reviewing the Company’s position of demonstrated compliance and has not initiated escalated enforcement. At this time, the Company cannot predict the impact of this issue. Furthermore, the Michigan coke battery facility is the subject of an investigation by the MDEQ concerning visible emissions readings that resulted from the Company self reporting to MDEQ questionable activities by an employee of a contractor hired by the Company to perform the visible emissions readings. At this time, the Company cannot predict the impact of this investigation.


29


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

The Company received two NOVs from the Pennsylvania Department of Environmental Protection (PADEP) in 2010 alleging violations of the permit for the Pennsylvania coke battery facility in connection with coal pile storm water runoff. The Company has implemented best management practices to address this issue. The Company recently received a permit to upgrade its existing waste water treatment system and is currently seeking a permit from the PADEP to upgrade its wastewater treatment technology to a biological treatment facility. The Company expects to spend less than $3 million on the existing waste water treatment system to comply with existing water discharge requirements and to upgrade its coal pile storm water runoff management program. The Company will also spend up to an additional $15 million over the next few years to upgrade the treatment technology to biological treatment to meet future regulatory requirements and gain other operational improvement savings.

The Company also received an NOV from the Allegheny County (PA) Health Department pertaining to excessive opacity readings from fugitive sources (mainly pushing emissions) in excess of its opacity standards for the Pennsylvania coke battery facility. Fugitive sources at the plant are in full compliance with the applicable Federal Opacity Standards. In February 2014, the Company received from the Group Against Smog & Pollution (GASP) a 60 day Notice of Intent to sue letter under the Federal Clean Air Act and/or Article XXI of the Allegheny County (PA) Health Department's Rules and Regulations. GASP alleged in the letter that the Company's coke battery facility in Pennsylvania was in violation of visible emissions limits from charging activities, door leaks, the combustion stack and pushing operations and hydrogen sulfide emission limits on flared, mixed or combusted coke oven gas. To resolve these issues, the Company has agreed to a Consent Order and Agreement with Allegheny County pursuant to which the Company will pay a fine of $300,000 and spend $300,000 for a supplemental environmental project to enhance particulate collection efficiency from the coke battery's quench tower. As a result, GASP's right to sue related to these alleged violations is foreclosed.

The Company believes that its non-utility businesses are substantially in compliance with all environmental requirements, other than as noted above.

Other

In December 2012, the EPA finalized a new set of regulations regarding the identification of non-hazardous secondary materials that are considered solid waste, industrial boiler and process heater maximum achievable control technologies (IBMACT) for major and area sources, and commercial/industrial solid waste incinerator new source performance standard and emission guidelines (CISWI). Capital costs for pollution controls and/or boiler conversions and the expenses for the one-time energy assessments are not expected to be material.

In 2010, the EPA finalized a new 1-hour sulfur dioxide ambient air quality standard that requires states to submit plans for non-attainment areas to be in compliance by 2017. Michigan's non-attainment area includes DTE Energy facilities in southwest Detroit and areas of Wayne County. Preliminary modeling runs by the MDEQ suggest that emission reductions may be required by significant sources of sulfur dioxide emissions in these areas, including DTE Electric power plants and our Michigan coke battery. The state implementation plan process is in the information gathering stage, and DTE Energy is unable to estimate any required emissions reductions at this time.

Nuclear Operations

Property Insurance

DTE Electric maintains property insurance policies specifically for the Fermi 2 plant. These policies cover such items as replacement power and property damage. The Nuclear Electric Insurance Limited (NEIL) is the primary supplier of the insurance policies.

DTE Electric maintains a policy for extra expenses, including replacement power costs necessitated by Fermi 2’s unavailability due to an insured event. This policy has a 12-week waiting period and provides an aggregate $490 million of coverage over a three-year period.

As of April 1, 2014, DTE Electric has $1.5 billion in primary coverage and $1.25 billion of excess coverage for stabilization, decontamination, debris removal, repair and/or replacement of property and decommissioning. The combined coverage limit for total property damage is $2.75 billion, subject to a $1 million deductible. The total limit for property damage for non-nuclear events is $2 billion and an aggregate of $327 million of coverage for extra expenses over a two-year period.


30


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

In 2007, the Terrorism Risk Insurance Extension Act of 2005 (TRIA) was extended through December 31, 2014. A major change in the extension is the inclusion of “domestic” acts of terrorism in the definition of covered or “certified” acts. For multiple terrorism losses caused by acts of terrorism not covered under the TRIA occurring within one year after the first loss from terrorism, the NEIL policies would make available to all insured entities up to $3.2 billion, plus any amounts recovered from reinsurance, government indemnity, or other sources to cover losses.

Under the NEIL policies, DTE Electric could be liable for maximum assessments of up to approximately $35 million per event if the loss associated with any one event at any nuclear plant should exceed the accumulated funds available to NEIL.

Public Liability Insurance

As required by federal law, DTE Electric maintains $375 million of public liability insurance for a nuclear incident. For liabilities arising from a terrorist act outside the scope of TRIA, the policy is subject to one industry aggregate limit of $300 million. Further, under the Price-Anderson Amendments Act of 2005, deferred premium charges up to $127.3 million could be levied against each licensed nuclear facility, but not more than $19 million per year per facility. Thus, deferred premium charges could be levied against all owners of licensed nuclear facilities in the event of a nuclear incident at any of these facilities.

Nuclear Fuel Disposal Costs

In accordance with the Federal Nuclear Waste Policy Act of 1982, DTE Electric has a contract with the U.S. Department of Energy (DOE) for the future storage and disposal of spent nuclear fuel from Fermi 2. DTE Electric is obligated to pay the DOE a fee of 1 mill per kWh of Fermi 2 electricity generated and sold. The fee is a component of nuclear fuel expense. The DOE's Yucca Mountain Nuclear Waste Repository program for the acceptance and disposal of spent nuclear fuel was terminated in 2011. DTE Electric currently employs a spent nuclear fuel storage strategy utilizing a fuel pool. The Company continues to develop its on-site dry cask storage facility and has scheduled the initial offload from the spent fuel pool in 2014. The dry cask storage facility is expected to provide sufficient spent fuel storage capability for the life of the plant as defined by the original operating license.

DTE Electric is a party in the litigation against the DOE for both past and future costs associated with the DOE's failure to accept spent nuclear fuel under the timetable set forth in the Federal Nuclear Waste Policy Act of 1982. In July 2012, DTE Electric executed a settlement agreement with the federal government for costs associated with the DOE's delay in acceptance of spent nuclear fuel from Fermi 2 for permanent storage. The settlement provided for a payment of approximately $48 million, received in August 2012, for delay-related costs experienced by DTE Electric through 2010, and a claims process for submittal of delay-related costs from 2011 through 2013. DTE Electric has begun the claims process and claims are being settled on a timely basis. The settlement proceeds reduced the cost of the dry cask storage facility assets. In January 2014, the settlement agreement was extended through 2016. The federal government continues to maintain its legal obligation to accept spent nuclear fuel from Fermi 2 for permanent storage. Issues relating to long-term waste disposal policy and to the disposition of funds contributed by DTE Electric ratepayers to the federal waste fund await future governmental action.

In February 2013, the U.S. Court of Appeals for the District of Columbia (COA) granted a motion to reopen the fee adequacy litigation to review the DOE's latest fee adequacy report which was released in January 2013. In November 2013, the COA issued a decision ordering the DOE to submit a proposal to Congress to reduce the nuclear waste fee to zero until the DOE enacts an alternative nuclear waste management plan. In January 2014, the DOE submitted such a proposal to Congress that will take effect in 90 legislative calendar days, absent legislative action to the contrary. Simultaneously, the DOE filed a petition for rehearing of the November 2013 decision with the COA. In March 2014, the COA denied DOE's petition for rehearing. DTE Electric continues to pay fees to the U.S. government's nuclear waste fund pending further developments in this proceeding.

Synthetic Fuel Guarantees

The Company discontinued the operations of its synthetic fuel production facilities throughout the United States as of December 31, 2007. The Company provided certain guarantees and indemnities in conjunction with the sales of interests in its synfuel facilities. The guarantees cover potential commercial, environmental, oil price and tax-related obligations and will survive until 90 days after expiration of all applicable statutes of limitations. The Company estimates that its maximum potential liability under these guarantees at March 31, 2014 is approximately $1.1 billion. Payment under these guarantees is considered remote.

31


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)


Reduced Emissions Fuel Guarantees

The Company has provided certain guarantees and indemnities in conjunction with the sales of interests in its reduced emissions fuel facilities. The guarantees cover potential commercial, environmental, and tax-related obligations and will survive until 90 days after expiration of all applicable statutes of limitations. The Company estimates that its maximum potential liability under these guarantees at March 31, 2014 is approximately $111 million. Payment under these guarantees is considered remote.

Other Guarantees

In certain limited circumstances, the Company enters into contractual guarantees. The Company may guarantee another entity’s obligation in the event it fails to perform. The Company may provide guarantees in certain indemnification agreements. Finally, the Company may provide indirect guarantees for the indebtedness of others. The Company’s guarantees are not individually material with maximum potential payments totaling $60 million at March 31, 2014. Payment under these guarantees is considered remote.

The Company is periodically required to obtain performance surety bonds in support of obligations to various governmental entities and other companies in connection with its operations. As of March 31, 2014, the Company had approximately $41 million of performance bonds outstanding. In the event that such bonds are called for nonperformance, the Company would be obligated to reimburse the issuer of the performance bond. The Company is released from the performance bonds as the contractual performance is completed and does not believe that a material amount of any currently outstanding performance bonds will be called.

Labor Contracts

There are several bargaining units for the Company's approximately 4,900 represented employees. The majority of the represented employees are under contracts that expire in 2016 and 2017.

Purchase Commitments

As of March 31, 2014, the Company was party to numerous long-term purchase commitments relating to a variety of goods and services required for the Company’s business. These agreements primarily consist of fuel supply commitments, renewable energy contracts and energy trading contracts. The Company estimates that these commitments will be approximately $9.1 billion from 2014 through 2051.

The Company also estimates that 2014 capital expenditures will be approximately $2.3 billion. The Company has made certain commitments in connection with expected capital expenditures.

Bankruptcies

The Company purchases and sells electricity, natural gas, coal, coke and other energy products from and to governmental entities and numerous companies operating in the steel, automotive, energy, retail, financial and other industries. Certain of its customers have filed for bankruptcy protection under the U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers and its purchase and sale contracts and records provisions for amounts considered at risk of probable loss. The Company believes its accrued amounts are adequate for probable loss.

The Company's utilities provide services to the city of Detroit, Michigan (Detroit). Detroit filed for Chapter 9 bankruptcy protection on July 18, 2013. The Company had pre-petition accounts receivable of approximately $20 million outstanding as of the bankruptcy filing date. Detroit has been paying amounts owed in a timely manner and its accounts are substantially current. The Company does not expect Detroit's bankruptcy filing to have a material impact on its financial results.

32


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Other Contingencies

The Company is involved in certain other legal, regulatory, administrative and environmental proceedings before various courts, arbitration panels and governmental agencies concerning claims arising in the ordinary course of business. These proceedings include certain contract disputes, additional environmental reviews and investigations, audits, inquiries from various regulators, and pending judicial matters. The Company cannot predict the final disposition of such proceedings. The Company regularly reviews legal matters and records provisions for claims that it can estimate and are considered probable of loss. The resolution of these pending proceedings is not expected to have a material effect on the Company’s operations or financial statements in the periods they are resolved.

See Notes 4 and 6 for a discussion of contingencies related to derivatives and regulatory matters.


NOTE 11 — RETIREMENT BENEFITS AND TRUSTEED ASSETS

The following table details the components of net periodic benefit costs for pension benefits and other postretirement benefits:
 
Pension Benefits
 
Other Postretirement Benefits
 
2014
 
2013
 
2014
 
2013
Three Months Ended March 31
(In millions)
Service cost
$
21

 
$
24

 
$
9

 
$
16

Interest cost
53

 
48

 
23

 
24

Expected return on plan assets
(68
)
 
(67
)
 
(31
)
 
(27
)
Amortization of:
 
 
 
 
 
 
 
Net actuarial loss
38

 
51

 
5

 
17

Prior service credit

 

 
(36
)
 
(23
)
Net periodic benefit cost (credit)
$
44

 
$
56

 
$
(30
)
 
$
7


Pension and Other Postretirement Contributions

During the first three months of 2014, the Company contributed $31 million to its pension plans. At the discretion of management, and depending upon financial market conditions, the Company may make up to an additional $160 million contribution to its pension plans in 2014.

At the discretion of management, the Company may make up to a $145 million contribution to its other postretirement benefit plans in 2014.


NOTE 12 — STOCK-BASED COMPENSATION

The following table summarizes the components of stock-based compensation:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Stock-based compensation expense
$
33

 
$
28

Tax benefit
$
13

 
$
11

Stock-based compensation cost capitalized in property, plant and equipment
$
5

 
$
2



33


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Stock Options

The following table summarizes our stock option activity for the three months ended March 31, 2014:
 
Number of
Options
 
Weighted
Average
Exercise Price
 
Aggregate
Intrinsic
Value (In millions)
Options outstanding at January 1, 2014
723,697

 
$
42.60

 
 
Exercised
(163,594
)
 
$
41.13

 
 
Forfeited or expired
(10,730
)
 
$
39.41

 
 
Options outstanding and exercisable at March 31, 2014
549,373

 
$
43.10

 
$
14


As of March 31, 2014, the weighted average remaining contractual life for the exercisable shares is 3.84 years. As of March 31, 2014, all options were vested.

The intrinsic value of options exercised for the three months ended March 31, 2014 and 2013 was $5 million and $7 million, respectively. No option expense was recognized for the three months ended March 31, 2014 and 2013, respectively.

Restricted Stock Awards

The following table summarizes the Company’s restricted stock awards activity for the three months ended March 31, 2014:
 
Restricted
Stock
 
Weighted Average
Grant Date
Fair Value
Balance at January 1, 2014
492,329

 
$
53.76

Grants
132,490

 
$
69.01

Forfeitures
(8,196
)
 
$
61.83

Vested and issued
(162,767
)
 
$
46.88

Balance at March 31, 2014
453,856

 
$
60.53


Performance Share Awards

The following table summarizes the Company’s performance share activity for the three months ended March 31, 2014:
 
Performance Shares
Balance at January 1, 2014
1,608,789

Grants
520,204

Forfeitures
(8,872
)
Payouts
(571,177
)
Balance at March 31, 2014
1,548,944


Unrecognized Compensation Costs

As of March 31, 2014, there was $100 million of total unrecognized compensation cost related to non-vested stock incentive plan arrangements. That cost is expected to be recognized over a weighted-average period of 1.67 years.


NOTE 13 — SEGMENT AND RELATED INFORMATION

The Company sets strategic goals, allocates resources and evaluates performance based on the following structure:

Electric segment consists principally of DTE Electric, which is engaged in the generation, purchase, distribution and sale of electricity to approximately 2.1 million residential, commercial and industrial customers in southeastern Michigan.


34


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)

Gas segment consists of DTE Gas and Citizens.  DTE Gas is engaged in the purchase, storage, transportation, distribution and sale of natural gas to approximately 1.2 million residential, commercial and industrial customers throughout Michigan and the sale of storage and transportation capacity. Citizens distributes natural gas in Adrian, Michigan to approximately 17,000 customers.

Gas Storage and Pipelines consists of natural gas pipeline, gathering and storage businesses.

Power and Industrial Projects is comprised primarily of projects that deliver energy and utility-type products and services to industrial, commercial and institutional customers; produce reduced emissions fuel (REF) and sell electricity from biomass-fired energy projects.

Energy Trading consists of energy marketing and trading operations.

Corporate and Other, includes various holding company activities, holds certain non-utility debt and energy-related investments.

The federal income tax provisions or benefits of DTE Energy’s subsidiaries are determined on an individual company basis and recognize the tax benefit of production tax credits and net operating losses if applicable. The state and local income tax provisions of the utility subsidiaries are determined on an individual company basis and recognizes the tax benefit of various tax credits and net operating losses if applicable. The subsidiaries record federal, state and local income taxes payable to or receivable from DTE Energy based on the federal, state and local tax provisions of each company.

Inter-segment billing for goods and services exchanged between segments is based upon tariffed or market-based prices of the provider and primarily consists of the sale of reduced emissions fuel, power sales and natural gas sales in the following segments:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Inter-segment Revenues
 
 
 
Electric
$
7

 
$
6

Gas
2

 
1

Gas Storage and Pipelines
1

 
2

Power and Industrial Projects
206

 
205

Energy Trading
9

 
11

Corporate and Other
2

 
(8
)
 
$
227

 
$
217


35


DTE Energy Company
Notes to Consolidated Financial Statements (Unaudited) — (Continued)


Financial data of the business segments follows:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
 
 
 
Electric
$
1,412

 
$
1,219

Gas
804

 
604

Gas Storage and Pipelines
52

 
27

Power and Industrial Projects
575

 
490

Energy Trading
1,314

 
393

Corporate & Other

 

Reconciliation & Eliminations
(227
)
 
(217
)
Total
$
3,930

 
$
2,516

Net Income (Loss) Attributable to DTE Energy by Segment:
 
 
 
Electric
$
136

 
$
115

Gas
129

 
96

Gas Storage and Pipelines
21

 
17

Power and Industrial Projects
15

 
12

Energy Trading
42

 
7

Corporate & Other
(17
)
 
(13
)
Net Income Attributable to DTE Energy
$
326

 
$
234


36



Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

OVERVIEW

DTE Energy is a diversified energy company and is the parent company of DTE Electric and DTE Gas, regulated electric and natural gas utilities engaged primarily in the business of providing electricity and natural gas sales, distribution and storage services throughout Michigan. We operate three energy-related non-utility segments with operations throughout the United States.

Net income attributable to DTE Energy in the first quarter of 2014 was $326 million, or $1.84 per diluted share, compared to net income attributable to DTE Energy of $234 million, or $1.34 per diluted share, in the first quarter of 2013. The increase in net income in the first quarter is due to higher earnings across all segments, primarily the Electric, Gas and Energy Trading segments.

Please see detailed explanations of segment performance in the following Results of Operations section.

DTE Energy's strategy is to achieve long-term earnings growth, a strong balance sheet and an attractive dividend yield.

Our utilities' growth will be driven by base infrastructure, environmental and renewable investments. We are focused on executing plans to achieve operational excellence and customer satisfaction with a focus on customer affordability. We operate in a constructive regulatory environment and have solid relationships with our regulators.

We have significant investments in our non-utility businesses. We employ disciplined investment criteria when assessing growth opportunities that leverage our assets, skills and expertise and provide diversity in earnings and geography. Specifically, we invest in targeted energy markets with attractive competitive dynamics where meaningful scale is in alignment with our risk profile. We expect growth opportunities in the Gas Storage and Pipelines and Power and Industrial Projects segments.

A key priority for DTE Energy is to maintain a strong balance sheet which facilitates access to capital markets and reasonably priced short-term and long-term financing. Near-term growth will be funded through internally generated cash flows and the issuance of debt. We have an enterprise risk management program that, among other things, is designed to monitor and manage our exposure to earnings and cash flow volatility related to commodity price changes, interest rates and counterparty credit risk.

CAPITAL INVESTMENTS

Our utility businesses require significant base capital investments each year in order to maintain and improve the reliability of asset bases, including power generation plants, distribution systems, storage fields and other facilities and fleets. DTE Electric's capital investments over the 2014-2018 period are estimated at $5.6 billion for base infrastructure, $700 million for environmental compliance requirements and $400 million for renewable energy and energy efficiency expenditures. DTE Electric plans to seek regulatory approval in general rate case filings and renewable energy plan filings for capital expenditures consistent with prior ratemaking treatment.

DTE Gas's capital investments over the 2014-2018 period are estimated at $700 million for base infrastructure and $500 million for gas main renewal and meter move out and pipeline integrity programs. In April 2013, the MPSC issued an order approving an infrastructure recovery mechanism (IRM) for DTE Gas and authorized the recovery of the cost of service related to $77 million of annual investment in its gas main renewal and meter move out and pipeline integrity programs. DTE Gas plans to seek regulatory approval in general rate case filings for base infrastructure capital expenditures consistent with prior ratemaking treatment.

ENVIRONMENTAL MATTERS

We are subject to extensive environmental regulation. Additional costs may result as the effects of various substances on the environment are studied and governmental regulations are developed and implemented. Actual costs to comply could vary substantially. We expect to continue recovering environmental costs related to utility operations through rates charged to our customers.


37



DTE Electric is subject to the EPA ozone and fine particulate transport and acid rain regulations that limit power plant emissions of sulfur dioxide and nitrogen oxides. Since 2005, the EPA and the State of Michigan have issued additional emission reduction regulations relating to ozone, fine particulate, regional haze and mercury air pollution. These rules will lead to additional emission controls on fossil-fueled power plants to reduce nitrogen oxide, sulfur dioxide, acid gases, particulate matter and mercury emissions. To comply with these requirements, DTE Electric spent approximately $2 billion through 2013. It is estimated that DTE Electric will make capital expenditures of approximately $280 million in 2014 and up to approximately $1.2 billion of additional capital expenditures through 2021 based on current regulations.

Climate regulation and/or legislation has been proposed and discussed within the U.S. Congress and the EPA. The EPA is implementing regulatory actions under the Clean Air Act to address emissions of greenhouse gases (GHGs). EPA regulation of GHGs requires the best available control technology (BACT) for new major sources or modifications to existing major sources that cause significant increases in GHG emissions. In June 2012, the EPA proposed new source performance standards for carbon dioxide emissions from new fossil-fueled power plants. These new source performance standards were re-proposed on September 20, 2013, under a presidential directive issued on June 25, 2013. Under the same presidential directive, the EPA is expected to propose performance standards for carbon dioxide emissions from existing and modified plants by June 1, 2014 and issue final standards by June 1, 2015. DTE Energy will be an active participant in working with the EPA and other stakeholders to shape the final performance standards for new and existing power plants. The standards for new sources are not expected to have a material impact on the Company. It is not possible to determine the potential impact of future regulations on existing sources at this time. Pending or future legislation or other regulatory actions could have a material impact on our operations and financial position and the rates we charge our customers. Impacts include expenditures for environmental equipment beyond what is currently planned, financing costs related to additional capital expenditures, the purchase of emission offsets from market sources and the retirement of facilities where control equipment is not economical. We would seek to recover these incremental costs through increased rates charged to our utility customers as authorized by the MPSC. Increased costs for energy produced from traditional coal based sources could also increase the economic viability of energy produced from renewable and/or nuclear sources, from energy efficiency initiatives, and from the potential development of market-based trading of carbon offsets which could provide new business opportunities for our utility and non-utility segments. At the present time, it is not possible to quantify the financial impacts of these climate related legislative or regulatory initiatives on DTE Energy or its customers.

See Note 10 of the Notes to the Consolidated Financial Statements.

OUTLOOK

The next few years will be a period of rapid change for DTE Energy and for the energy industry. Our strong utility base, combined with our integrated non-utility operations, position us well for long-term growth.

Looking forward, we will focus on several areas that we expect will improve future performance:

electric and gas customer satisfaction;

electric reliability;

rate competitiveness and affordability;

regulatory stability and investment recovery for our utilities;

growth of our utility asset base;

employee engagement;

cost structure optimization across all business segments;

cash, capital and liquidity to maintain or improve our financial strength; and

investments that integrate our assets and leverage our skills and expertise.

We will continue to pursue opportunities to grow our businesses in a disciplined manner if we can secure opportunities that meet our strategic, financial and risk criteria.


38



RESULTS OF OPERATIONS

The following sections provide a detailed discussion of the operating performance and future outlook of our segments.

 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Net Income (Loss) Attributable to DTE Energy by Segment:
 
 
 
Electric
$
136

 
$
115

Gas
129

 
96

Gas Storage and Pipelines
21

 
17

Power and Industrial Projects
15

 
12

Energy Trading
42

 
7

Corporate and Other
(17
)
 
(13
)
Net Income Attributable to DTE Energy Company
$
326

 
$
234


ELECTRIC

Our Electric segment consists principally of DTE Electric.

Electric results are discussed below:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
$
1,412

 
$
1,219

Fuel and Purchased Power
498

 
372

Gross Margin
914

 
847

Operation and Maintenance
343

 
331

Depreciation and Amortization
230

 
214

Taxes Other Than Income
71

 
70

Asset (Gains) and Losses, Reserves and Impairments, Net

 
(1
)
Operating Income
270

 
233

Other (Income) and Deductions
58

 
57

Income Tax Expense
76

 
61

Net Income Attributable to DTE Energy Company
$
136

 
$
115

Operating Income as a Percent of Operating Revenues
19
%
 
19
%

Gross margin increased $67 million in the three months ended March 31, 2014. Revenues associated with certain tracking mechanisms and surcharges are offset by related expenses elsewhere in the Consolidated Statements of Operations.
 
The following table details changes in various gross margin components relative to the comparable prior period:
 
Three Months
 
(In millions)
Amortization of refundable revenue decoupling/deferred gain
$
32

Base sales, inclusive of weather effect
13

Securitization bond and tax surcharge
8

Renewable energy program
4

Low income energy assistance surcharge
6

Regulatory mechanisms and other
4

Increase in gross margin
$
67



39



 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In thousands of MWh)
Electric Sales
 
 
 
Residential
3,978

 
3,854

Commercial
4,048

 
3,923

Industrial
2,501

 
2,436

Other
205

 
252

 
10,732

 
10,465

Interconnection sales (a)
618

 
773

Total Electric Sales
11,350

 
11,238

Electric Deliveries
 

 
 

Retail and Wholesale
10,732

 
10,465

Electric Customer Choice, including self generators (b)
1,267

 
1,260

Total Electric Sales and Deliveries
11,999

 
11,725

______________________________
(a)
Represents power that is not distributed by DTE Electric.
(b)
Represents deliveries for self generators who have purchased power from alternative energy suppliers to supplement their power requirements.

Operation and maintenance expense increased $12 million in the three months ended March 31, 2014 due primarily to higher power plant generation expenses for planned outages of $27 million, increased low income energy assistance of $6 million and higher energy optimization and renewable energy expenses of $2 million, partially offset by lower employee benefit expenses of $24 million.

Depreciation and amortization expense increased $16 million in the three months ended March 31, 2014 due to higher amortization of regulatory assets of $11 million, primarily related to Securitization, and $5 million of increased expense due to a higher depreciable base.

Outlook   We continue to move forward in our efforts to achieve operational excellence, sustained strong cash flows and earn our authorized return on equity. We expect that our planned significant capital investments will result in earnings growth. Looking forward, additional factors may impact earnings such as weather, the outcome of regulatory proceedings, benefit plan design changes, investment returns and changes in discount rate assumptions in benefit plans and health care costs, and uncertainty of legislative or regulatory actions regarding climate change and electric customer choice. We expect to continue our efforts to improve productivity and decrease our costs while improving customer satisfaction with consideration of customer rate affordability.

GAS

Our Gas segment consists of DTE Gas and Citizens.

Gas results are discussed below:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
$
804

 
$
604

Cost of Gas
439

 
299

Gross Margin
365

 
305

Operation and Maintenance
110

 
106

Depreciation and Amortization
25

 
23

Taxes Other Than Income
17

 
16

Operating Income
213

 
160

Other (Income) and Deductions
12

 
12

Income Tax Expense
72

 
52

Net Income Attributable to DTE Energy Company
$
129

 
$
96

Operating Income as a Percent of Operating Revenues
26
%
 
26
%

40



Gross margin increased $60 million in the three months ended March 31, 2014. Revenues associated with certain tracking mechanisms and surcharges are offset by related expenses elsewhere in the Consolidated Statements of Operations.

The following table details changes in various gross margin components relative to the comparable prior period:
 
Three Months
 
(In millions)
Weather
$
46

Midstream storage and transportation services
16

Energy optimization revenue
(6
)
Other
4

Increase in gross margin
$
60


 
Three Months Ended
 
March 31,
 
2014
 
2013
Gas Markets (in Bcf)
 
 
 
Gas sales
71

 
58

End user transportation
62

 
55

 
133

 
113

Intermediate transportation
99

 
76

 
232

 
189


Operation and maintenance expense increased $4 million in the three months ended March 31, 2014 due primarily to higher weather-related gas operations expenses of $12 million, partially offset by lower energy optimization expenses of $6 million and lower employee benefit expenses of $4 million.

Outlook — We continue to move forward in our efforts to achieve operational excellence, sustained strong cash flows and earn our authorized return on equity. We expect that our planned significant capital investments will result in earnings growth. Looking forward, additional factors may impact earnings such as weather, the outcome of regulatory proceedings, benefit plan design changes, and investment returns and changes in discount rate assumptions in benefit plans and health care costs. We expect to continue our efforts to improve productivity and decrease our costs while improving customer satisfaction with consideration of customer rate affordability.

GAS STORAGE AND PIPELINES

Our Gas Storage and Pipelines segment consists of our non-utility gas pipelines and storage businesses.

Gas Storage and Pipelines results are discussed below:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
$
52

 
$
27

Operation and Maintenance
11

 
5

Depreciation and Amortization
7

 
4

Taxes Other Than Income
1

 
1

Operating Income
33

 
17

Other (Income) and Deductions
(2
)
 
(11
)
Income Tax Expense
14

 
11

Net Income Attributable to DTE Energy Company
$
21

 
$
17



41



Operating revenues increased $25 million due primarily to higher volumes on the Bluestone pipeline, additional segments placed in service in the Susquehanna gathering system and higher storage revenue.

Operation and maintenance expenses increased $6 million and depreciation and amortization expenses increased $3 million due to the operation of the Bluestone and Susquehanna projects.
  
Other (income) and deductions decreased by $9 million due to lower earnings from a pipeline investment and higher intercompany interest expense.

Outlook — Our Gas Storage and Pipelines business expects to maintain its steady growth by developing an asset portfolio with multiple growth platforms through investment in new projects and expansions. We will continue to look for additional investment opportunities and other storage and pipeline projects at favorable prices. Millennium Pipeline completed its Phase One expansion in 2013, and its Phase Two expansion was placed in service at the end of March 2014. Additionally, Bluestone, a 44-mile lateral pipeline in Susquehanna County, Pennsylvania and Broome County, New York is in service and volumes are increasing. We plan to expand the capacity of the Bluestone lateral by constructing additional compression facilities, meter upgrades, and other initiatives to accommodate increased shipper demand. Through our agreement with Southwestern Energy Services Company and affiliates, we believe Bluestone lateral and Susquehanna gathering system are strategically positioned for future growth of the Marcellus shale. Progress continues on preliminary development activities on the proposed Nexus pipeline. The Nexus pipeline will serve as a transportation path for natural gas from the Utica shale in Ohio to Michigan and Ontario. We are planning to have a one-third partnership interest in the pipeline.

POWER AND INDUSTRIAL PROJECTS

Power and Industrial Projects is comprised primarily of projects that deliver energy and utility-type products and services to industrial, commercial and institutional customers; produce REF and sell electricity from biomass-fired energy projects.

Power and Industrial Projects results are discussed below:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
$
575

 
$
490

Operation and Maintenance
576

 
481

Depreciation and Amortization
18

 
18

Taxes other than Income
5

 
5

Asset (Gains) and Losses, Reserves and Impairments, Net
(1
)
 
(3
)
Operating Income (Loss)
(23
)
 
(11
)
Other (Income) and Deductions
(13
)
 
(9
)
Income Taxes
 
 
 
Expense
(4
)
 
(1
)
Production Tax Credits
(22
)
 
(14
)
 
(26
)
 
(15
)
Net Income
16

 
13

Noncontrolling interest
1

 
1

Net Income Attributable to DTE Energy Company
$
15

 
$
12


Operating revenues increased $85 million in the three months ended March 31, 2014. The increase in the first quarter of 2014 was primarily due to a $107 million increase associated with higher volumes from REF projects, offset by a $23 million decrease from lower coal prices associated with the steel business.

Operation and maintenance expense increased $95 million in the three months ended March 31, 2014. The increase in the first quarter of 2014 was primarily due to a $107 million increase associated with higher volumes from REF projects and a $5 million increase associated with start-up of a biomass-fired power project, offset by an $18 million decrease from lower coal prices associated with the steel business.

Production tax credits increased by $8 million in the three months ended March 31, 2014 primarily due to tax credits earned from REF projects.


42



Outlook  The Company has constructed and placed in service nine REF facilities including four facilities located at third party owned coal-fired power plants. The Company has sold membership interests in four of the facilities. We continue to optimize these facilities by seeking investors for facilities operating at DTE Electric and other utility sites. Additionally, we have begun relocating an underutilized facility to a third party owned coal-fired power plant and intend to relocate the remaining underutilized facility, located at a DTE Electric site, to an alternative coal-fired power plant which may provide increased production and emission reduction opportunities in 2014 and future years.

We expect sustained production levels of metallurgical coke and pulverized coal supplied to steel industry customers for 2014. Substantially all of the metallurgical coke margin is maintained under long-term contracts. We have five biomass-fired power generation facilities in operation. Our on-site energy services will continue to be delivered in accordance with the terms of long-term contracts. We have begun construction on a new natural gas-fired cogeneration facility and two landfill gas to energy projects which are expected to be completed in 2014. We will continue to look for additional investment opportunities and other energy projects at favorable prices.

Power and Industrial Projects will continue to leverage its extensive energy-related operating experience and project management capability to develop additional energy projects to serve energy intensive industrial customers.

ENERGY TRADING

Energy Trading focuses on physical and financial power, natural gas and coal marketing and trading, structured transactions, enhancement of returns from DTE Energy’s asset portfolio, and optimization of contracted natural gas pipeline transportation and storage, and generating capacity positions. Energy Trading also provides natural gas, power and related services, which may include the management of associated storage and transportation contracts on the customers’ behalf, and the supply or purchase of renewable energy credits to various customers.

Energy Trading results are discussed below:
 
Three Months Ended
 
March 31,
 
2014
 
2013
 
(In millions)
Operating Revenues
$
1,314

 
$
393

Fuel, Purchased Power and Gas
1,226

 
357

Gross Margin
88

 
36

Operation and Maintenance
16

 
21

Taxes Other Than Income
1

 
2

Operating Income
71

 
13

Other (Income) and Deductions
2

 
2

Income Tax Expense
27

 
4

Net Income Attributable to DTE Energy Company
$
42

 
$
7


Operating revenues and Fuel, purchased power and gas were impacted by an increase in gas prices and volumes, primarily in our gas structured and gas transportation strategies.

Gross margin increased $52 million for the three months ended March 31, 2014. The overall increase in gross margin for the first quarter was primarily due to timing related gains in the gas structured and transportation strategies, partially offset by losses in our power full requirements strategy.

During the first quarter of 2014, we experienced extreme weather conditions in the Midwest and Northeast gas and power markets we serve. Consequently, this led to favorable results in our gas asset optimization strategies due to higher gas prices and volumes which were partially offset by realized losses from our power full requirements strategy due to higher than expected loads, energy prices, and ancillary charges to serve our customers.

The first quarter increase in gross margin of $52 million represents a $48 million increase in realized margins and a $4 million increase in unrealized margins. The $48 million increase in realized margins is due to $123 million of favorable results, primarily in our gas structured and gas transportation strategies, offset by $75 million of unfavorable results, primarily in our power full requirements strategy. The $4 million increase in unrealized margins is due to $29 million of favorable results, primarily in our gas trading and power full requirements strategies, offset by $25 million of unfavorable results, primarily in our gas structured, gas storage, and our power and gas trading strategies.

43




Natural gas structured transactions typically involve a physical purchase or sale of natural gas in the future and/or natural gas basis financial instruments which are derivatives and a related non-derivative pipeline transportation contract. These gas structured transactions can result in significant earnings volatility as the derivative components are marked-to-market without revaluing the related non-derivative contracts. During the fourth quarter of 2013, we saw significant increases in gas prices which led to the volatility in the accounting earnings due to the physical component being marked-to-market without an offsetting mark on the transportation component. Included in the $123 million of favorable results in our gas strategies is $51 million of timing related losses recognized in the fourth quarter of 2013 that reversed during the first quarter as the underlying contracts were settled.

Outlook — In the near-term, we expect market conditions to remain challenging and the profitability of this segment may be impacted by the volatility in commodity prices in the markets we participate in and the uncertainty of impacts associated with financial reform, regulatory changes and changes in operating rules of regional transmission organizations.

The Energy Trading portfolio includes financial instruments, physical commodity contracts and natural gas inventory, as well as contracted natural gas pipeline transportation and storage, and generation capacity positions. Energy Trading also provides natural gas, power and related services, which may include the management of associated storage and transportation contracts on the customers' behalf under FERC Asset Management Arrangements, and the supply or purchase of renewable energy credits to various customers. Significant portions of the Energy Trading portfolio are economically hedged. Most financial instruments and physical power and natural gas contracts are deemed derivatives, whereas natural gas inventory, pipeline transportation, renewable energy credits, and storage assets are not derivatives. As a result, we will experience earnings volatility as derivatives are marked-to-market without revaluing the underlying non-derivative contracts and assets. Our strategy is to economically manage the price risk of these underlying non-derivative contracts and assets with futures, forwards, swaps and options. This results in gains and losses that are recognized in different interim and annual accounting periods.

See Notes 3 and 4 of the Notes to Consolidated Financial Statements.

CORPORATE AND OTHER

Corporate and Other includes various holding company activities and holds certain non-utility debt and energy-related investments. The net loss of $17 million in the three months ended March 31, 2014, represents an increase of $4 million from the loss of $13 million in the comparable 2013 period. The increased loss was due primarily to higher deferred tax expense related to New York state income tax reform enacted on March 31, 2014.


CAPITAL RESOURCES AND LIQUIDITY

Cash Requirements

We use cash to maintain and expand our electric and natural gas utilities and to grow our non-utility businesses, retire and pay interest on long-term debt and pay dividends. We believe that we will have sufficient internal and external capital resources to fund anticipated capital and operating requirements. We expect that cash from operations in 2014 will be approximately $1.6 billion, or approximately $500 million lower than 2013, due primarily to lower surcharge collections and higher cash contributions to employee benefit plans. We anticipate base level utility capital investments, environmental, renewable and energy optimization expenditures and expenditures for non-utility businesses in 2014 of approximately $2.3 billion. We plan to seek regulatory approval to include utility capital expenditures in our regulatory rate base consistent with prior treatment. Capital spending for growth of existing or new non-utility businesses will depend on the existence of opportunities that meet our strict risk-return and value creation criteria.

44



 
Three Months Ended March 31,
 
2014
 
2013
 
(In millions)
Cash and Cash Equivalents
 
 
 
Cash Flow From (Used For)
 
 
 
Operating activities:
 
 
 
Net income
$
327

 
$
235

Depreciation, depletion and amortization
280

 
259

Nuclear fuel amortization
5

 
9

Allowance for equity funds used during construction
(5
)
 
(3
)
Deferred income taxes
77

 
65

Asset (gains) and losses, reserves and impairments, net
(1
)
 
(6
)
Working capital and other
(151
)
 
38

 
532

 
597

Investing activities:
 
 
 
Plant and equipment expenditures — utility
(399
)
 
(309
)
Plant and equipment expenditures — non-utility
(98
)
 
(73
)
Proceeds from sale of assets
3

 
4

Other
52

 
46

 
(442
)
 
(332
)
Financing activities:
 
 
 
Issuance of long-term debt, net of issuance costs

 
372

Redemption of long-term debt
(115
)
 
(141
)
Short-term borrowings, net
244

 
(240
)
Issuance of common stock

 
10

Repurchase of common stock
(50
)
 

Dividends on common stock and other
(123
)
 
(113
)
 
(44
)
 
(112
)
Net Increase in Cash and Cash Equivalents
$
46

 
$
153


Cash from Operating Activities

A majority of our operating cash flow is provided by our electric and natural gas utilities, which are significantly influenced by factors such as weather, electric Customer Choice, regulatory deferrals, regulatory outcomes, economic conditions and operating costs.

Cash from operations in the three months ended March 31, 2014 was $65 million lower than the comparable 2013 period. The operating cash flow comparison reflects higher cash expenditures for working capital items partially offset by higher net income after adjusting for non-cash and non-operating items (primarily depreciation, depletion and amortization, and deferred income taxes).

Cash used for Investing Activities

Cash inflows associated with investing activities are primarily generated from the sale of assets, while cash outflows are the result of plant and equipment expenditures. In any given year, we will look to realize cash from under-performing or non-strategic assets or matured fully valued assets.

Capital spending within the utility businesses is primarily to maintain and improve our electric generation and electric and natural gas distribution infrastructure and to comply with environmental regulations and renewable energy requirements.

Capital spending within our non-utility businesses is primarily for ongoing maintenance, expansion and growth. We look to make growth investments that meet strict criteria in terms of strategy, management skills, risks and returns. All new investments are analyzed for their rates of return and cash payback on a risk adjusted basis. We have been disciplined in how we deploy capital and will not make investments unless they meet our criteria. For new business lines, we initially invest based on research and analysis. We start with a limited investment, we evaluate results and either expand or exit the business based on those results. In any given year, the amount of growth capital will be determined by the underlying cash flows of the Company with a clear understanding of any potential impact on our credit ratings.


45



Net cash used for investing activities was higher by $110 million in 2014 due primarily to increased capital expenditures by our utility and non-utility businesses.

Cash used for Financing Activities

We rely on both short-term borrowing and long-term financing as a source of funding for our capital requirements not satisfied by our operations.

Our strategy is to have a targeted debt portfolio blend of fixed and variable interest rates and maturity. We continually evaluate our leverage target, which is currently 50% to 52%, to ensure it is consistent with our objective to have a strong investment grade debt rating.

Net cash used for financing activities was lower by $68 million in 2014 due primarily to increased short-term borrowings, decreased redemptions and issuances of long-term debt, partially offset by repurchases of common stock and higher dividends on common stock.

Outlook

We expect cash flow from operations to increase over the long-term primarily as a result of growth from our utilities and non-utility businesses. We expect growth in our utilities to be driven primarily by capital spending to maintain and improve our electric generation and electric and natural gas distribution infrastructure and to comply with new and existing state and federal regulations that will result in additional environmental and renewable energy investments which will increase the base from which rates are determined. Our non-utility growth is expected from additional investments primarily in our Gas Storage and Pipelines and Power and Industrial Projects segments.

We may be impacted by the timing of collection or refund of various recovery and tracking mechanisms as a result of timing of MPSC orders. Energy prices are likely to be a source of volatility with regard to working capital requirements for the foreseeable future. We are continuing our efforts to identify opportunities to improve cash flow through working capital initiatives and maintaining flexibility in the timing and extent of our long-term capital projects.

We have approximately $1 billion in long-term debt maturing in the next twelve months. The repayment of the principal amount of the Securitization debt is funded through a surcharge payable by DTE Electric’s customers. The repayment of the other debt is expected to be paid through internally generated funds or the issuance of long-term debt.

DTE Energy has approximately $1.5 billion of available liquidity at March 31, 2014, consisting of cash and amounts available under unsecured revolving credit agreements.

During the first three months of 2014, we contributed $31 million to our pension plans. At the discretion of management, and depending upon financial market conditions, we may make up to an additional $160 million contribution to our pension plans in 2014. At the discretion of management, we may make up to a $145 million contribution to our other postretirement benefit plans in 2014.

Various subsidiaries of the Company have entered into contracts which contain ratings triggers and are guaranteed by DTE Energy. These contracts contain provisions which allow the counterparties to require that the Company post cash or letters of credit as collateral in the event that DTE Energy’s credit rating is downgraded below investment grade. Certain of these provisions (known as “hard triggers”) state specific circumstances under which the Company can be required to post collateral upon the occurrence of a credit downgrade, while other provisions (known as “soft triggers”) are not as specific. For contracts with soft triggers, it is difficult to estimate the amount of collateral which may be requested by counterparties and/or which the Company may ultimately be required to post. The amount of such collateral which could be requested fluctuates based on commodity prices (primarily natural gas, power and coal) and the provisions and maturities of the underlying transactions. As of March 31, 2014, DTE Energy's contractual obligation to post collateral in the form of cash or letter of credit in the event of a downgrade to below investment grade, under both hard trigger and soft trigger provisions, was approximately $444 million.


46



We believe we have sufficient operating flexibility, cash resources and funding sources to maintain adequate amounts of liquidity and to meet our future operating cash and capital expenditure needs. However, virtually all of our businesses are capital intensive, or require access to capital, and the inability to access adequate capital could adversely impact earnings and cash flows.

See Notes 6, 8, 9 and 11 of the Notes to Consolidated Financial Statements.

FAIR VALUE

Derivatives are generally recorded at fair value and shown as Derivative Assets or Liabilities. Contracts we typically classify as derivative instruments include power, natural gas, oil and certain coal forwards, futures, options and swaps, and foreign currency exchange contracts. Items we do not generally account for as derivatives include natural gas inventory, pipeline transportation, renewable energy credits and storage assets. See Notes 3 and 4 of the Notes to Consolidated Financial Statements.

The tables below do not include the expected earnings impact of non-derivative natural gas storage, transportation, certain power contracts and renewable energy credits which are subject to accrual accounting. Consequently, gains and losses from these positions may not match with the related physical and financial hedging instruments in some reporting periods, resulting in volatility in DTE Energy’s reported period-by-period earnings; however, the financial impact of the timing differences will reverse at the time of physical delivery and/or settlement.

The Company manages its MTM risk on a portfolio basis based upon the delivery period of its contracts and the individual components of the risks within each contract. Accordingly, the Company records and manages the energy purchase and sale obligations under its contracts in separate components based on the commodity (e.g. electricity or natural gas), the product (e.g. electricity for delivery during peak or off-peak hours), the delivery location (e.g. by region), the risk profile (e.g. forward or option), and the delivery period (e.g. by month and year).

The Company has established a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value in three broad levels. The fair value hierarchy gives the highest priority to quoted prices (unadjusted) in active markets for identical assets or liabilities (Level 1) and the lowest priority to unobservable inputs (Level 3). For further discussion of the fair value hierarchy. See Note 3 of the Notes to Consolidated Financial Statements.

The following tables provide details on changes in our MTM net asset (or liability) position for the three months ended March 31, 2014:
 
Total
 
(In millions)
MTM at January 1, 2014
$
(112
)
Reclassify to realized upon settlement
23

Changes in fair value recorded to income
21

Amounts recorded to unrealized income
44

Changes in fair value recorded in regulatory liabilities
4

Change in collateral held by (for) others
8

Option premiums paid (received) and other
(4
)
MTM at March 31, 2014
$
(60
)

The table below shows the maturity of our MTM positions:
Source of Fair Value
 
2014
 
2015
 
2016
 
2017
 and
 Beyond
 
Total Fair Value
 
 
(In millions)
Level 1
 
$
(6
)
 
$
3

 
$

 
$
1

 
$
(2
)
Level 2
 
14

 
(25
)
 
(2
)
 

 
(13
)
Level 3
 
(39
)
 
(7
)
 
2

 
1

 
(43
)
MTM before collateral adjustments
 
$
(31
)
 
$
(29
)
 
$

 
$
2

 
(58
)
Collateral adjustments
 
 
 
 
 
 
 
 
 
(2
)
MTM at March 31, 2014
 
 
 
 
 
 
 
 
 
$
(60
)

47




Item 3. Quantitative and Qualitative Disclosures About Market Risk

Market Price Risk

The Electric and Gas businesses have commodity price risk, primarily related to the purchases of coal, natural gas, uranium, and electricity. However, the Company does not bear significant exposure to earnings risk as such changes are included in the PSCR and GCR regulatory rate-recovery mechanisms. In addition, changes in the price of natural gas can impact the valuation of lost and stolen gas and storage sales revenue at the Gas segment. Gas segment manages its market price risk related to storage sales revenue primarily through the sale of long-term storage contracts. The Company is exposed to short-term cash flow or liquidity risk as a result of the time differential between actual cash settlements and regulatory rate recovery.

Our Gas Storage and Pipelines business segment has exposure to natural gas price fluctuations which impact the pricing for natural gas storage and transportation. The Company manages its exposure through the use of short, medium and long-term storage and transportation contracts.

Our Power and Industrial Projects business segment is subject to electricity, natural gas and coal price risk. The Company manages its exposure through the use of long-term contracts.

Our Energy Trading business segment has exposure to electricity, natural gas, coal, crude oil, heating oil, and foreign currency exchange price fluctuations. These risks are managed by our energy marketing and trading operations through the use of forward energy, capacity, storage, options and futures contracts, within pre-determined risk parameters.

Credit Risk

Bankruptcies

The Company purchases and sells electricity, natural gas, coal, coke and other energy products from and to governmental entities and numerous companies operating in the steel, automotive, energy, retail, financial and other industries. Certain of its customers have filed for bankruptcy protection under the U.S. Bankruptcy Code. The Company regularly reviews contingent matters relating to these customers and its purchase and sale contracts and records provisions for amounts considered at risk of probable loss. The Company believes its accrued amounts are adequate for probable loss.

The Company's utilities provide services to the city of Detroit, Michigan (Detroit). Detroit filed for Chapter 9 bankruptcy protection on July 18, 2013. The Company had pre-petition accounts receivable of approximately $20 million outstanding as of the bankruptcy filing date. Detroit has been paying amounts owed in a timely manner and its account is substantially current. The Company does not expect Detroit's bankruptcy filing to have a material impact on its financial results.
Other

We engage in business with customers that are non-investment grade. We closely monitor the credit ratings of these customers and, when deemed necessary, we request collateral or guarantees from such customers to secure their obligations.


48



Trading Activities

We are exposed to credit risk through trading activities. Credit risk is the potential loss that may result if our trading counterparties fail to meet their contractual obligations. We utilize both external and internal credit assessments when determining the credit quality of our trading counterparties.

The following table displays the credit quality of our trading counterparties as of March 31, 2014:
 
Credit Exposure
Before Cash
Collateral
 
Cash
Collateral
 
Net Credit
Exposure
 
(In millions)
Investment Grade (a)
 
 
 
 
 
A− and Greater
$
427

 
$
(12
)
 
$
415

BBB+ and BBB
272

 

 
272

BBB−
85

 

 
85

Total Investment Grade
784

 
(12
)
 
772

Non-investment grade (b)
2

 

 
2

Internally Rated — investment grade (c)
301

 

 
301

Internally Rated — non-investment grade (d)
24

 
(4
)
 
20

Total
$
1,111

 
$
(16
)
 
$
1,095

_______________________________________
(a)
This category includes counterparties with minimum credit ratings of Baa3 assigned by Moody’s Investors Service (Moody’s) or BBB- assigned by Standard & Poor’s Rating Group, a division of McGraw-Hill Companies, Inc. (Standard & Poor’s). The five largest counterparty exposures, combined, for this category represented approximately 16% of the total gross credit exposure.
(b)
This category includes counterparties with credit ratings that are below investment grade. The five largest counterparty exposures, combined, for this category represented less than 1% of the total gross credit exposure.
(c)
This category includes counterparties that have not been rated by Moody’s or Standard & Poor’s, but are considered investment grade based on DTE Energy’s evaluation of the counterparty’s creditworthiness. The five largest counterparty exposures, combined, for this category represented approximately 19% of the total gross credit exposure.
(d)
This category includes counterparties that have not been rated by Moody’s or Standard & Poor’s, and are considered non-investment grade based on DTE Energy’s evaluation of the counterparty’s creditworthiness. The five largest counterparty exposures, combined, for this category represented approximately 2% of the total gross credit exposure.

Interest Rate Risk

We are subject to interest rate risk in connection with the issuance of debt. In order to manage interest costs, we may use treasury locks and interest rate swap agreements. Our exposure to interest rate risk arises primarily from changes in U.S. Treasury rates, commercial paper rates and London Inter-Bank Offered Rates (LIBOR). As of March 31, 2014, we had a floating rate debt-to-total debt ratio of approximately 5% (excluding securitized debt).

Foreign Currency Exchange Risk

We have foreign currency exchange risk arising from market price fluctuations associated with fixed priced contracts. These contracts are denominated in Canadian dollars and are primarily for the purchase and sale of natural gas and power as well as for long-term transportation capacity. To limit our exposure to foreign currency exchange fluctuations, we have entered into a series of foreign currency exchange forward contracts through November 2017.


49



Summary of Sensitivity Analysis

We performed a sensitivity analysis on the fair values of our commodity contracts, long-term debt obligations and foreign currency exchange forward contracts. The commodity contracts and foreign currency exchange risk listed below principally relate to our energy marketing and trading activities. The sensitivity analysis involved increasing and decreasing forward rates at March 31, 2014 and 2013 by a hypothetical 10% and calculating the resulting change in the fair values.

The results of the sensitivity analysis calculations as of March 31, 2014 and 2013:
 
 
Assuming a
10% Increase in Rates
 
Assuming a
10% Decrease in Rates
 
 
 
 
As of March 31,
 
As of March 31,
 
 
Activity
 
2014
 
2013
 
2014
 
2013
 
Change in the Fair Value of
 
 
(In millions)
 
 
Coal contracts
 
$
2

 
$

 
$
(2
)
 
$

 
Commodity contracts
Natural gas contracts
 
$
(12
)
 
$
(6
)
 
$
12

 
$
8

 
Commodity contracts
Electricity contracts
 
$
14

 
$
(5
)
 
$
(14
)
 
$
5

 
Commodity contracts
Interest rate risk
 
$
(283
)
 
$
(270
)
 
$
300

 
$
285

 
Long-term debt
Foreign currency exchange risk
 
$

 
$

 
$

 
$

 
Forward contracts
Discount rates
 
$

 
$

 
$

 
$

 
Commodity contracts

For further discussion of market risk, see Note 4 of the Notes to Consolidated Financial Statements.


50




Item 4. Controls and Procedures

(a) Evaluation of disclosure controls and procedures

Management of the Company carried out an evaluation, under the supervision and with the participation of DTE Energy's Chief Executive Officer (CEO) and Chief Financial Officer (CFO), of the effectiveness of the design and operation of the Company's disclosure controls and procedures (as defined in Exchange Act Rules 13a-15(e) and 15d-15(e)) as of March 31, 2014, which is the end of the period covered by this report. Based on this evaluation, the Company's CEO and CFO have concluded that such disclosure controls and procedures are effective in providing reasonable assurance that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act (i) is recorded, processed, summarized and reported within the time periods specified in the SEC's rules and forms and (ii) is accumulated and communicated to the Company's management, including its CEO and CFO, as appropriate to allow timely decisions regarding required disclosure. Due to the inherent limitations in the effectiveness of any disclosure controls and procedures, management cannot provide absolute assurance that the objectives of its disclosure controls and procedures will be attained.

(b) Changes in internal control over financial reporting

There have been no changes in the Company's internal control over financial reporting during the quarter ended March 31, 2014 that have materially affected, or are reasonably likely to materially affect, the Company's internal control over financial reporting.



51




Part II — OTHER INFORMATION

Item 1. Legal Proceedings

In July 2009, DTE Energy received a NOV/FOV from the EPA alleging, among other things, that five DTE Electric power plants violated New Source Performance standards, Prevention of Significant Deterioration requirements, and operating permit requirements under the Clean Air Act. In June 2010, the EPA issued a NOV/FOV making similar allegations related to a project and outage at Unit 2 of the Monroe Power Plant. In March 2013, DTE Energy received a supplemental NOV from the EPA relating to the July 2009 NOV/FOV. The supplemental NOV alleged additional violations relating to the New Source Review provisions under the Clean Air Act, among other things.

In August 2010, the U.S. Department of Justice, at the request of the EPA, brought a civil suit in the U.S. District Court for the Eastern District of Michigan against DTE Energy and DTE Electric, related to the June 2010 NOV/FOV and the outage work performed at Unit 2 of the Monroe Power Plant, but not relating to the July 2009 NOV/FOV. Among other relief, the EPA requested the court to require DTE Electric to install and operate the best available control technology at Unit 2 of the Monroe Power Plant. Further, the EPA requested the court to issue a preliminary injunction to require DTE Electric to (i) begin the process of obtaining the necessary permits for the Monroe Unit 2 modification and (ii) offset the pollution from Monroe Unit 2 through emissions reductions from DTE Electric's fleet of coal-fired power plants until the new control equipment is operating. On August 23, 2011, the U.S. District Court judge granted DTE Energy's motion for summary judgment in the civil case, dismissing the case and entering judgment in favor of DTE Energy and DTE Electric. On October 20, 2011, the EPA caused to be filed a Notice of Appeal to the U.S. Court of Appeals for the Sixth Circuit. On March 28, 2013, the Court of Appeals remanded the case to the U.S. District Court for review of the procedural component of the New Source Review notification requirements. On September 3, 2013, the EPA caused to be filed a motion seeking leave to amend their complaint regarding the June 2010 NOV/FOV adding additional claims related to outage work performed at the Trenton Channel and Belle River power plants as well as additional claims related to work performed at the Monroe Power Plant. In addition, the Sierra Club caused to be filed a motion to add a claim regarding the River Rouge Power Plant. On March 3, 2014, the U.S. District Court judge granted again DTE Energy's motion for summary judgment dismissing the civil case related to Monroe Unit 2. On April 3, 2014, the U.S. District Court judge granted motions filed by the EPA and the Sierra Club to amend their New Source Review complaint adding additional claims for Monroe Units 1, 2 and 3, Belle River Units 1 and 2, Trenton Channel Unit 9 and River Rouge Unit 3.
DTE Energy and DTE Electric believe that all the plants and generating units identified by the EPA and the Sierra Club have complied with all applicable federal environmental regulations. Depending upon the outcome of discussions with the EPA regarding the two NOVs/FOVs, DTE Electric could be required to install additional pollution control equipment at some or all of the power plants in question, implement early retirement of facilities where control equipment is not economical, engage in supplemental environmental programs, and/or pay fines. The Company cannot predict the financial impact or outcome of this matter, or the timing of its resolution.

In March 2013, the Sierra Club filed suit against DTE Energy and DTE Electric alleging violations of the Clean Air Act at four of DTE Electric's coal-fired power plants. The plaintiffs allege 1,499 6-minute periods of excess opacity of air emissions from 2007-2012 at those facilities. The suit asks that the court enjoin DTE Energy and DTE Electric from operating the power plants except in complete compliance with applicable laws and permit requirements, pay civil penalties, conduct beneficial environmental mitigation projects, pay attorney fees and require the installation of any necessary pollution controls or to convert and/or operate the plants' boilers on natural gas to avoid additional violations and to off-set historic unlawful emissions. In December 2013, a U.S. District Court judge issued an order dismissing, without prejudice, the plaintiff's complaint allowing them to file an amended complaint by January 17, 2014. The order dismissing the complaint resulted from a considerable number of plaintiff's claims being time barred based on the statute of limitations. On January 17, 2014, the plaintiffs filed an amended complaint for the period January 13, 2008 - June 30, 2012, reducing the total number of 6-minute periods from 1,499 to 1,139. DTE Energy and DTE Electric filed an answer to the amended complaint on March 11, 2014. The resolution of this matter is not expected to have a material effect on the Company's operations or financial statements.


52



In February 2014, the Company received from the Group Against Smog & Pollution ("GASP") a 60 day Notice of Intent to sue letter under the Federal Clean Air Act and/or Article XXI of the Allegheny County (PA) Health Department's Rules and Regulations. GASP alleged in the letter that the Company's coke battery facility in Pennsylvania was in violation of visible emissions limits from charging activities, door leaks, the combustion stack and pushing operations and hydrogen sulfide emission limits on flared, mixed or combusted coke oven gas. To resolve these issues, the Company has agreed to a Consent Order and Agreement with Allegheny County pursuant to which the Company will pay a fine of $300,000 and spend $300,000 for a supplemental environmental project to enhance particulate collection efficiency from the coke battery's quench tower. As a result, GASP's right to sue related to these alleged violations is foreclosed.

For additional discussion on legal matters, see Notes 6 and 10 of the Notes to Consolidated Financial Statements.


Item 1A. Risk Factors

There are various risks associated with the operations of DTE Energy's utility and non-utility businesses. To provide a framework to understand the operating environment of DTE Energy, we have provided a brief explanation of the more significant risks associated with our businesses in Part 1, Item 1A. Risk Factors in the Company's 2013 Form 10-K. Although we have tried to identify and discuss key risk factors, others could emerge in the future.


Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

The following table provides information about our purchases of equity securities that are registered by the Company pursuant to Section 12 of the Exchange Act of 1934 for the quarter ended March 31, 2014:
 
Number of
Shares
Purchased (a)
 
Average
Price
Paid per
Share (a)
 
Number
of Shares
Purchased as
Part of Publicly
Announced
Plans or
Programs
 
Average
Price Paid
per Share
 
Maximum Dollar
Value that May
Yet Be
Purchased Under
the Plans or
Programs
01/01/2014 — 01/31/2014
984

 
$
67.52

 

 

 

02/01/2014 — 02/28/2014
756,604

 
$
72.23

 

 

 

03/01/2014 — 03/31/2014
2,500

 
$
68.55

 

 

 

Total
760,088

 
 

 

 
 

 
 

_______________________________________
(a)
Represents shares of common stock purchased on the open market to provide shares to participants under various employee compensation and incentive programs. Also includes shares of common stock withheld to satisfy income tax obligations upon the vesting of restricted stock.


Item 6. Exhibits
 
 
(i) Exhibits filed herewith:
 
 
 
10-88
 
Amended and Restated DTE Energy Company Long-Term Incentive Plan (as Amended February 6, 2014)
 
 
 
12-57
 
Computation of Ratio of Earnings to Fixed Charges
 
 
 
31-89
 
Chief Executive Officer Section 302 Form 10-Q Certification of Periodic Report
 
 
 
31-90
 
Chief Financial Officer Section 302 Form 10-Q Certification of Periodic Report
 
 
 
101.INS
 
XBRL Instance Document
 
 
 
101.SCH
 
XBRL Taxonomy Extension Schema
 
 
 
101.CAL
 
XBRL Taxonomy Extension Calculation Linkbase
 
 
 
101.DEF
 
XBRL Taxonomy Extension Definition Database
 
 
 
101.LAB
 
XBRL Taxonomy Extension Label Linkbase
 
 
 
101.PRE
 
XBRL Taxonomy Extension Presentation Linkbase

53



 
 
(ii) Exhibits incorporated herein by reference:
 
 
 
10-89
 
Form of Change-In-Control Severance Agreement dated as of March 3, 2014, between DTE Energy Company and each of Gerard M. Anderson, Steven E. Kurmas, David E. Meador, Peter B. Oleksiak, Gerardo Norcia, Bruce D. Peterson and Larry E. Steward. (Exhibit 10.1 to Form 8-K filed on March 3, 2014)
 
 
(iii) Exhibits furnished herewith:
 
 
 
32-89
 
Chief Executive Officer Section 906 Form 10-Q Certification of Periodic Report
 
 
 
32-90
 
Chief Financial Officer Section 906 Form 10-Q Certification of Periodic Report

54




Signature
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 
 
DTE ENERGY COMPANY
 
 
(Registrant)
 
 
 
 
 
 
Date: April 25, 2014
By 
/s/  DONNA M. ENGLAND
 
 
Donna M. England
Chief Accounting Officer
(Principal Accounting Officer)


55